11 MAC Pt. 8, R. 1.7.5
Right of the Operator and the Department to Complete Reclamation
Cite as 11 Miss. Admin. Code Pt. 8, R. 1.7.5
Right of the Operator and the Department to Complete Reclamation
The operator and, in case of bond forfeiture, the Department, shall have the continuing right to
enter the affected area included in the reclamation plan and to perform thereon the reclamation measures
required properly to complete the reclamation plan.