15 MAC Pt. 20, R. 1.10.3
Each public water system shall complete an initial cross connection survey by
Cite as 15 Miss. Admin. Code Pt. 20, R. 1.10.3
Each public water system shall complete an initial cross connection survey by
December 31, 2000.
15 MAC Pt. 20, R. 1.10.3
Cite as 15 Miss. Admin. Code Pt. 20, R. 1.10.3