15 MAC Pt. 20, R. 5.4.7
Mitigation
Cite as 15 Miss. Admin. Code Pt. 20, R. 5.4.7
Mitigation
1.
Allowable costs include the costs of:
A.
Mitigation of only direct adverse physical impacts resulting from
construction of the project.
B.
Reasonable site screening necessary to comply with required
environmental review and necessary to screen adjacent properties.
C.
Groundwater monitoring facilities necessary to determine the
possibility of groundwater deterioration, depletion or modification
resulting from construction of the project. The extent of the
allowable costs for groundwater monitoring facilities is decided on
a case-by-case basis and depends on the size and complexity of the
project and the present and potential future use of the groundwater.
2.
Unallowable costs include the costs of:
A.
Solutions to aesthetic problems, including design details which
require expensive building techniques and architectural features
and hardware, that are unreasonable or substantially higher in cost
than approvable alternatives and that neither enhance the function
or appearance of the treatment works nor reflect regional
architectural tradition.
B.
Land acquired for the mitigation of adverse environmental effects
identified pursuant to an environmental review.