15 MAC Pt. 20, R. 5.5.2
Recommended Allowance for Construction Phase Professional Services
Cite as 15 Miss. Admin. Code Pt. 20, R. 5.5.2
Recommended Allowance for Construction Phase Professional Services.
The Allowance for Construction Phase Professional Services includes costs for
engineering services during bidding, construction, and post-construction phases,
observation during construction, Grant administration and other services (i.e.
legal, audit, etc.) that are associated with the construction of the ARPA RWAIG
project. The recommended allowance for construction phase professional services
will be determined using Table 2 in this Subchapter.
This table is not intended to be used to determine the actual compensation for
construction phase professional services. Compensation for these professional
services should be based upon the nature, scope, and complexity of the services
required for the project.
Table 2 separates the Total Recommended Allowance for Construction Phase
Professional Services shown in the far-right hand column into three types of
services: engineering, Grant administration, and other services and provides
suggested ranges for each of these services depending upon the complexity of the
project. The Grant applicant/recipient should consider these recommended ranges
when evaluating proposals for these services. If the proposals exceed the normal
ranges for any of these services, the Grant applicant/recipient should consider
requiring the professional to justify why the project is more difficult than normal.
The actual compensation justified for a particular project may be more or less
than the suggested range of the allowance for these services shown in Table 2.
If the consulting engineer and Grant applicant/recipient determine that the
maximum recommended allowance calculated using Table 2 in this Subchapter
does not adequately reflect the nature, scope, and complexity of the services
required for the project, the consulting engineer may submit a detailed cost
proposal, in such format as required by the Department, justifying a compensation
amount greater than Table 2 recommends. If in the Department's opinion the
detailed cost proposal justifies such, the Department will approve an allowance
for construction phase professional services greater than those recommended in
Table 2. The decision of the Department in this matter will be final.
Although Table 2 shows engineering and Grant administration as separate costs,
the Grant applicant/recipient is not required by these regulations to contract for
these services separately. The Grant applicant/recipient may wish to have the
consulting engineer provide both scopes of services, and under such an
arrangement, the engineer's contract should not exceed the total of the suggested
ranges for both services.