ARM 36.14.207. CHANGE IN CLASSIFICATION

SupersededLast amended: 2012Length: 112 wordsOfficial source

Cite as Mont. Admin. R. 36.14.207

(1) A high-hazard dam owner may request the department to reconsider a hazard determination. (a) A request for reconsideration must include the data and analyses necessary to show that the dam is not a high-hazard dam. (b) The owner shall pay for reasonable inspection costs incurred by the department as a result of the reconsideration. (2) A classification of high-hazard dam is automatically rescinded if the dam is constructed to impound less than 50 acre-feet measured to the maximum normal operating pool, or if the dam is breached. (a) A construction permit is necessary to perform the construction to reduce the impoundment capacity of the high-hazard dam or breach the high-hazard dam.