ARM 36.22.1206

ARM 36.22.1206. TUBING REQUIRED

Last amended: 1972Length: 19 wordsOfficial source

Cite as Mont. Admin. R. 36.22.1206

All flowing oil wells shall be equipped with and produced through tubing, unless the well is a dual completion.
ARM 36.22.1206: ARM 36.22.1206. TUBING REQUIRED | Justis AI