ARM 17.20.1503

ARM 17.20.1503. ENERGY GENERATION AND CONVERSION FACILITIES, CONSTRUCTION DESCRIPTION

SupersededLast amended: 2001Length: 188 wordsOfficial source

Cite as Mont. Admin. R. 17.20.1503

(1) An application for a generation or conversion facility must include a preliminary construction schedule, a description of typical equipment, and a description of the sequential steps involved in carrying out major construction activities, including site preparation and an estimate of the amount of ground disturbance. The schedule must include associated facilities and relocations or development of transportation and other public use facilities necessitated by project construction, and methods of maintaining service during these activities. (2) An application for a generation or conversion facility must contain a description of the following: (a) plans for construction camps for the crew, if any, and any other temporary facilities used during construction; (b) the methods the applicant will use to reclaim any temporary facilities; (c) a schedule showing the anticipated timing of activities; (d) methods the applicant will use for fire control; and (e) for associated powerlines, a description meeting the requirements of ARM 17.20.1510, for voltages of 230kV and larger. For voltages less than 230kV, a general description of the components listed in ARM 17.20.1510 is sufficient; and (f) for associated pipelines, a description meeting the requirements of ARM 17.20.1511.
ARM 17.20.1503: ARM 17.20.1503. ENERGY GENERATION AND CONVERSION FACILITIES, CONSTRUCTION DESCRIPTION | Justis AI