ARM 17.38.312

ARM 17.38.312. VOLUNTARY CROSS-CONNECTION CONTROL PROGRAMS: STANDARDS AND REQUIREMENTS FOR CROSS-CONNECTION CONTROL

Last amended: 2024Length: 302 wordsOfficial source

Cite as Mont. Admin. R. 17.38.312

(1) The department shall approve a voluntary program for cross-connection control if: (a) the applicant has submitted an application that meets the requirements of ARM 17.38.310; (b) the program provides for elimination of cross-connections, health hazards, and non-health hazards, and for installation and maintenance of backflow prevention assemblies or devices in accordance with ARM 17.38.305; (c) the program provides that backflow prevention assemblies or devices must be inspected and tested, at least annually, in accordance with the "Manual of Cross-Connection Control", incorporated by reference in ARM 17.38.302; and (d) the program provides that inspection and testing of backflow prevention assemblies or devices must be performed by a certified backflow prevention assembly tester. (2) A cross-connection is exempt from the standards in this rule if the following conditions are met: (a) the cross-connection is with a public water supply system that has been approved by the department; (b) the owner or operator of the public water supply that is or will be connected to the system with the approved voluntary cross-connection control program: (i) sends a written request for an exemption to the public water supplier with the approved voluntary program; and (ii) submits a sanitary survey conducted within the three years preceding the request for an exemption that: (A) indicates that there are no cross-connections that violate the requirements of ARM 17.38.305(1) and (2) within the public water supply system that is or will be connected; and (B) has been conducted by the department or a person who has contracted with the department for the purpose of performing the sanitary survey; or (C) has been determined by the department to be complete and reliable; and (c) the public water supplier with the approved voluntary program determines that the public water supply that is or will be connected is acceptable as a source.
ARM 17.38.312: ARM 17.38.312. VOLUNTARY CROSS-CONNECTION CONTROL PROGRAMS: STANDARDS AND REQUIREMENTS FOR CROSS-CONNECTION CONTROL | Justis AI