ARM 17.50.1109

ARM 17.50.1109. RUN-ON AND RUN-OFF CONTROL SYSTEMS

Last amended: 2010Length: 84 wordsOfficial source

Cite as Mont. Admin. R. 17.50.1109

(1) The owner or operator of a Class II landfill unit shall design, construct, and maintain: (a) a run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm; and (b) a run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm. (2) Run-off from the active portion of the landfill unit must be handled in accordance with 17.50.1110(1).
ARM 17.50.1109: ARM 17.50.1109. RUN-ON AND RUN-OFF CONTROL SYSTEMS | Justis AI