ARM 17.50.721

ARM 17.50.721. POST-CLOSURE MONITORING

SupersededLast amended: 1995Length: 71 wordsOfficial source

Cite as Mont. Admin. R. 17.50.721

(1) Any facility that detects Table 1 [ARM 17.50.708] constituents of a hazardous substance in ground water at concentrations above background at the facility will be required to conduct post-closure ground water monitoring. (2) Any facility designated by 75-10-207, MCA, that closes on or after January 1, 1993, is required to monitor ground water for at least 30 years following closure. The post-closure monitoring schedule will be determined by the department.
ARM 17.50.721: ARM 17.50.721. POST-CLOSURE MONITORING | Justis AI