N.C. Op. Att'y Gen., Hollowell (Dec. 12, 1979)

Public Buildings; Plans and Specifications; Job-Installed Finishes, Color Schedule

Year: 1979Length: 159 wordsOfficial source
December 12, 1979 Subject: Public Buildings; Plans and Specifications; Job-Installed Finishes, Color Schedule Requested By: Edward E. Hollowell Attorney for Wake County Hospital, Inc. Question: Does G.S. 133-1.1(g); which requires plans and specifications for the construction or repair of certain public buildings to include a "color schedule" for "job-installed finishes", apply to all finished material incorporated into the construction work at the site, such as paint, wall covering, flooring, title, laminates and paneling? Conclusion: Yes. This Office is of the opinion that the term, "job-installed finishes", refers to "the final treatment or coating of a surface" as the word "finish" is defined in Webster’s Third New International Dictionary, and includes all of the items described when used as a final finish on the walls, ceilings floor of the inside of a building as well as when used as a final finish on the outside of a building. Rufus L. Edmisten Attorney General Eugene A. Smith Special Deputy Attorney General