01 NCAC 05B .0901

01 NCAC 05B .0901. RESPONSIBILITY

Last amended: 2016Length: 52 wordsOfficial source
In general, it is the responsibility of the receiving agency to inspect all materials, supplies, and equipment upon delivery to insure compliance with the contract requirements and specifications. However, when the contract requires an inspection by the Division of Purchase and Contract, it shall be conducted by a designee of the Division.
01 NCAC 05B .0901: 01 NCAC 05B .0901. RESPONSIBILITY | Justis AI