NDAC 69.5-01-08-02
Totalizator system
Cite as N.D. Admin. Code § 69.5-01-08-02
1.
Each association shall install and operate during its meeting a totalizator system approved by
the commission and such system must be tested prior to and during the meeting as required
by the commission.
2.
A licensee that is hosting pools shall use only a totalizator system approved by the
commission.
3.
A licensee hosting tournament style pools, including the tournament wager or 123racing
Pick-n Wager may elect to calculate pools using its own software and servers suitable for this
purpose rather than a licensed totalizator system only if all of the following conditions are met:
a.
Wagers made into the tournament pool are not comingled with wagers placed through
any other entity or any interstate or international combined wagering pools.
b.
The licensee provides a daily report of all tournament wagering activity including such
data as requested by the commission or as necessary to comply with statute or
administrative rules. The daily reports must be delivered to the commission's
independent auditor or other designated representative no later than 8:00 a.m. eastern
time the day following the generation of the wagers in a manner and format designated
by the commission.
c.
The licensee establishes a real-time data feed with a totalizator company approved by
the commission. The data feed must include the odds feed, stop betting, scheduled post
time, and payoffs for any race comprising part of the tournament wager. The data feed
may be provided via inter-tote system protocol, web service application program
interface, or other method capable of providing the required data as approved by the
commission. The licensee shall utilize a secure network for all data communications.
d.
The licensee utilizes the stop betting data from the real-time data feed to automatically
close wagering. The licensee's system also must be capable of automatically closing
wagering at post time in the event of an interruption in the real-time data feed.
e.
After close of wagering for a tournament or any race or races comprising the tournament,
the licensee makes all such picks publicly available by immediately posting a listing of all
selections by player in the tournament.
f.
The licensee obtains all necessary authorizations to allow the commission, its
independent auditor, or other designated representative to obtain pricing data files
directly from the host totalizator at a track holding a race which comprises part of the
tournament wager. If there is a discrepancy between the pricing data of the track host
totalizator and the licensee, the licensee shall work directly with the independent auditor
to identify and reconcile the error in accordance with section 69.5-01-11-04.1.
g.
The licensee provides any track holding a race which comprises part of the tournament
wager with authorization to view reports from the commission's independent auditor or
other designated representative providing the wagering data required in order to audit
licensee payments to the track.
h.
A totalizator company provides access to the commission, its independent auditor, or its
designated representative to its facility, records, and any other information as required by
the commission.
i.
The licensee submits a tournament wagering operations plan to the commission for its
review and approval. The operations plan must provide details on all operations specified
in this section as well as any additional information requested by the commission. The
plan must provide the following additional information and specifically address how the
licensees operations ensure the same level of integrity in the wagering process as
required of licensed totalizators pursuant to sections 69.5-01-11-13 through
69.5-01-11-15 as applicable:
(1)
Facility safety and security.
(2)
Hardware operation and security.
(3)
Software operation and security.
(4)
Management procedures.
(5)
Personnel requirements.
(6)
Reporting and log requirements.