1.
General management requirements.
a.
Programming.
(1)
A totalizator company shall develop and maintain written procedure manuals that
outline structured programming methods used by the programmers. The manuals
must give the programmers sufficient information to understand the programming
methodologies, base operating systems, and maintenance procedures.
(2)
The totalizator company shall develop and maintain a written systems development
life cycle that requires signoffs at pertinent checkpoints. It must address all the
following or the equivalent as acceptable to the commission;
(a)
A procedure for accepting written requests for systems design or major
program changes from users and a method for handling and recording these
requests.
(b)
The feasibility study stage.
(c)
The general systems design stage.
(d)
Detailed systems specification.
(e)
Program testing.
(f)
System testing.
(g)
Conversion.
(h)
Systems acceptance by the totalizator company.
(3)
A totalizator company must develop and follow procedures to manage all program
changes without regard to the complexity of the modification. The procedures must
do all of the following:
(a)
Establish controls to prevent unauthorized and potentially inaccurate program
changes from being incorporated into the production environment.
(b)
Regulate both scheduled and emergency changes to ensure the integrity of the
computer system.
(c)
Permit revisions of computer programs submitted on a sequentially numbered
basis.
(d)
Require program changes to be developed, tested, and compiled only in a test
environment that is not connected to an online totalizator network.
(e)
Require all program changes to be thoroughly tested, reviewed, and approved
pursuant to procedures adopted by the totalizator company before being
placed into operation.
(f)
Maintain a written or electronic log, to be made available to the commission
upon request, when programmers have physical access to the totalizator room
or electronic access to the operation environment.
(4)
Before a totalizator company may place a major programming revision into
production or transfer any data affected by the revision from the test environment to
the production environment, the totalizator company must follow the procedures
required by subdivision d of subsection 4 of section 69.5-01-11-13.
b.
Totalizator operations. A totalizator company shall maintain a written operations manual
for the totalizator system. The manual must clarify the authority, duties, responsibilities,
and lines of communication. The manual must contain sufficient detail to ensure
totalizator personnel understand their job duties. The operations manual must include
complete documentation for operation of the totalizator system and its software, including
all of the following:
(1)
The duties described in subsection 2.
(2)
Clearly defined restrictions for totalizator room access.
(3)
General block diagrams of program options (menu tree) available to totalizator
operations.
(4)
A glossary of terms used in reports, including formulas for calculating the displayed
results.
(5)
The relationship, if any, between information contained in reports.
(6)
Startup and shutdown procedures.
(7)
General operating procedures.
(8)
Restart and recovery procedures.
(9)
Emergency procedures, including a list of individuals to notify if a system requires
an emergency revision.
2.
Personnel requirements.
a.
General requirements.
(1)
A totalizator company must provide necessary personnel to perform the duties
described in the rules. The totalizator company shall employ a sufficient number of
personnel to ensure an adequate segregation of duties to avoid collusion. The
totalizator company may use job titles different from those in the rules.
(2)
All totalizator personnel assigned to work on totalizator operations in North Dakota
must be licensed by the commission.
(3)
The totalizator company shall have procedures and documentation that show the
verification of totalizator position applicants' experience and education as indicated
on their job applications. The totalizator company must prescribe and maintain job
descriptions containing the experience, education, and organization training
requirements for all of the following totalizator positions, if necessary:
(a)
Network manager.
(b)
Programmer or software engineer.
(c)
Systems analyst.
(d)
Totalizator operator.
(e)
Technicians.
(4)
The totalizator company must certify in writing annually that its personnel are
properly trained to program, manage, operate, and maintain the totalizator system.
The totalizator company must provide ongoing training to its personnel and
document the training.
(5)
The totalizator company is responsible for the actions of its personnel relating to the
operations and use of the totalizator system. The totalizator company shall
designate an individual to act as a point of contact for communications between the
commission and the totalizator company.
(6)
A totalizator company employee may not hold a position of programmer and
totalizator operator simultaneously unless approved by the commission.
(7)
A totalizator company employee is prohibited from wagering at any time at any
location where the company provides service.
(8)
The totalizator company shall have a policy of mandatory time away from the job for
each totalizator personnel within each calendar year.
b.
Network manager. The duties of a network manager shall include all of the following:
(1)
Coordinate the totalizator company's totalizator systems operating in North Dakota
or at a specific site in North Dakota.
(2)
Ensure each totalizator operator follows proper procedures when operating the
totalizator system.
(3)
Determine the onsite and offsite storage locations for the backup media.
(4)
Provide information and prepare any report requested by the authorized pari-mutuel
wagering entity, the commission, or the tax commissioner, if appropriate.
(5)
Ensure a current list of personnel is maintained, all totalizator operators are
qualified, and the appropriate pari-mutuel information is maintained within the
operating system and application programs.
c.
Totalizator operator. The duties of a totalizator operator shall include all of the following:
(1)
Maintain the communication links and ensure data is transmitted accurately.
(2)
Consult with the pari-mutuel manager and the commission or duly appointed
representative, if available, when a problem occurs in determining a pool or
calculation, and suggest alternatives for continued operation, including possible
temporary restrictions on or suspension of the communication links.
(3)
Perform necessary daily performance testing, system initialization, monitoring of
wagering operations, and system shutdown.
(4)
Execute established procedures to shut down system software and hardware in
emergency situations including loss of communication between computers or
peripheral devices, power surges or failures, operating with a partial system, and
restarting the system during a performance.
(5)
Perform necessary system maintenance.
(6)
Perform daily backups required by subdivision c of subsection 4 of section
69.5-01-11-13.
(7)
Ensure information is entered in the tote maintenance log detailing all repairs or
modifications to the totalizator system.
(8)
Provide to the commission an initial incident report within twenty-four hours of the
incident, with a final report submitted as necessary, detailing each unusual
occurrence during totalizator system operations, including a description of the
probable cause of the occurrence and the corrective action taken.
(9)
Maintain a copy of the incident report or enter information about each unusual
occurrence in the system incident log.
(10)
Consult with the commission or duly appointed representative regarding any other
operational issues encountered.
d.
Technicians. The duties of technicians shall include all of the following:
(1)
Service and maintain the totalizator.
(2)
Perform maintenance on wagering devices and the tote board.
(3)
Record in the totalizator maintenance log all maintenance and repair activities
performed.
3.
Totalizator network. Common pools must be merged and calculated at the site the totalizator
company designates as the network computing center. In a tote-to-tote network or at remote
sites, the totalizator company must use the inter-tote system protocol endorsed by the
association of racing commissions international or another inter-tote communication protocol
prescribed by the commission.
4.
Data transmission protocols. An authorized pari-mutuel wagering entity using a wagering
device-to-tote network may use whatever communications protocol it wishes. A remote site is
considered part of a tote-to-tote network and is subject to the requirements of subsection 3 of
section 69.5-01-11-13. If the failure to compile pools or payout winning prices is isolated to a
remote site, the stopping of wagering or the manual cashing and accounting of tickets need
only occur at the affected site. The relevant information must be transmitted between the
central processing location and the remote site through the established communication links
or facsimile machine and must be verified.