NDAC 74-03-07.1-02
Field inspection
Cite as N.D. Admin. Code ยง 74-03-07.1-02
All field inspection of buckwheat will be made in the bloom stage. A field harvested before
inspection will not be eligible for certification.
NDAC 74-03-07.1-02
Cite as N.D. Admin. Code ยง 74-03-07.1-02