NDAC 89-08-02-07
As built plans
Cite as N.D. Admin. Code ยง 89-08-02-07
As a condition on all construction permits, the owner of the dam, dike, or other device will provide
the department with "as built" plans within six months after the dam, dike, or other device has been
constructed to provide details of the modifications that occurred during construction.