NDAC 89-10-01-18
Reclamation
Cite as N.D. Admin. Code § 89-10-01-18
After cancellation, termination, abandonment, or expiration of an authorization, grantee must
reclaim the project location within one hundred twenty days. If the permit is for mining, reclamation
must be within sixty days after the lease expires or the mining is complete. Upon written request, the
department may extend the time period if good cause is shown. If grantee fails to reclaim the site to the
specifications in the authorization within the required time frame, the department may enter and restore
the project location. The grantee is liable for all reclamation costs.