NDAC 33.1-14-02-17
Reporting repairs to be made
Cite as N.D. Admin. Code ยง 33.1-14-02-17
1.
The owner or person in charge of a boiler repair shop making major repairs to a boiler shall
notify the chief boiler inspector of each major repair or alteration to be made to a boiler, and
the anticipated repair must be approved before work is started; or
2.
If the boiler is insured, covered by a written inspection agreement with an authorized
inspection agency, or owned by an owner/user inspection organization, the special inspector
may authorize the repair. After such repairs are made, the repairs are subject to the approval
of an inspector.