NDAC 33.1-14-03-01
Inspection of boilers
Cite as N.D. Admin. Code ยง 33.1-14-03-01
The owner or user shall prepare a boiler subject to regular inspections for such inspections or
hydrostatic tests when notified by the inspector. The owner or user shall prepare each boiler for internal
inspection and shall prepare for and apply the hydrostatic test whenever necessary, on the date
specified by the inspector, which may not be less than seven days after the date of notification.