NDAC 33.1-14-03-01

Inspection of boilers

Last amended: 2020Year: 2026Length: 65 wordsOfficial source

Cite as N.D. Admin. Code ยง 33.1-14-03-01

The owner or user shall prepare a boiler subject to regular inspections for such inspections or hydrostatic tests when notified by the inspector. The owner or user shall prepare each boiler for internal inspection and shall prepare for and apply the hydrostatic test whenever necessary, on the date specified by the inspector, which may not be less than seven days after the date of notification.
NDAC 33.1-14-03-01: Inspection of boilers | Justis AI