NDAC 33.1-14-03-03

Boiler improperly prepared for inspection

Last amended: 2020Year: 2026Length: 57 wordsOfficial source

Cite as N.D. Admin. Code ยง 33.1-14-03-03

If a boiler has not been properly prepared for an internal inspection or the owner or user fails to comply with the requirements for hydrostatic test as set forth in this article, the inspector may decline to make the inspection or test and withhold the certificate of inspection until the owner or user complies with the requirements.
NDAC 33.1-14-03-03: Boiler improperly prepared for inspection | Justis AI