NDAC 33.1-14-03-26
Inspection of boilers
Cite as N.D. Admin. Code ยง 33.1-14-03-26
1.
Each boiler used or proposed to be used within this state, except boilers exempt in North
Dakota Century Code section 23.1-16-06, must be thoroughly inspected as to their
construction, installation, condition, and operation as follows:
a.
Power boilers must be inspected annually both internally while not under pressure and
externally while under pressure. However, any power boiler or steam generator, the
operation of which is an integral part of or a necessary adjunct to other continuous
processing operations, must be inspected internally at such intervals as are permitted by
the shutting down of the processing operation. The chief boiler inspector may provide for
extension of time between internal inspections, but an external inspection must be made,
and report submitted, for purposes of issuing a certificate. In all other instances the
certificate inspection must be an internal inspection when construction permits.
b.
Power boilers of one hundred thousand pounds [45359.24 kilograms] per hour or more
capacity, which comply with subsection 2 of North Dakota Century Code section
23.1-16-07, must be inspected at least once every thirty-six months internally while not
under pressure and at least once every twelve months externally while under pressure.
c.
Steam traction engines must be inspected at least once every twelve months.
Inspections must alternate between internal inspections, external inspections, and
hydrostatic tests.
d.
Low-pressure steam boilers must be inspected annually. Low-pressure steam boilers of
steel construction must be inspected alternately internally and externally. The issuance of
a certificate must normally be based on the internal inspection.
e.
Hot water heating and hot water supply boilers must be inspected triennially unless they
are located in a nursing home, school, hospital, nursery school, or kindergarten, in which
case they must be inspected annually. Internal inspections will be required when deemed
necessary by the inspector.
f.
A grace period of two months beyond the period specified in the above subdivisions may
elapse between inspections.
2.
Certificate inspections must be made during the period of thirty days prior to and thirty days
after the expiration date of the certificate. Noncertificate inspections, when required by the
provisions of this section, must be made between certificate inspections. The chief boiler
inspector encourages reports to be made at any time adverse conditions are found, or when
difficulty is encountered getting cooperation from the owner or user.
3.
The inspections required under this section must be made by the chief boiler inspector, or by a
deputy inspector, or by a special inspector provided for in this article.
4.
If at any time a hydrostatic test is deemed necessary by the inspector, it must be made by the
owner or user in the presence of, and under the supervision of the inspector, and must be
approved by the inspector.
5.
Cast iron boilers must be considered as boilers that do not lend themselves to internal
inspections. Internal inspections of electric boilers must be made when deemed necessary by
the inspector.