NDAC 33.1-15-20-04
Requirements for control of production facility emissions
Cite as N.D. Admin. Code ยง 33.1-15-20-04
1.
The emissions from all treaters, separators, engines, incinerators, flares, tanks, and other
onsite equipment must comply with the requirements of subsection 5.
2.
Each flare used for combusting gas at a production facility must be equipped and operated
with an automatic ignitor or a continuous burning pilot which must be maintained and operated
in good working order. This is required even if the flare is used for emergency purposes only. A
continuous burning pilot is required if this department determines that an automatic ignition
system is ineffective due to production characteristics. The flare stack must be of sufficient
height to allow for adequate dispersion of air contaminants as necessary to meet the
requirements of this article.
3.
Any organic compound gases and vapors may be subject to controls as specified in chapter
33.1-15-07.
4.
Routine inspections and maintenance of tanks, hatches, compressors, vent lines, pressure
relief valves, packing elements, and couplings must be conducted to minimize emissions from
equipment at a production facility. Tank hatches must hold a positive working pressure or must
be repaired or replaced.
5.
The owner or operator of any oil or gas well production facility shall install equipment
necessary to ensure that emissions comply with the ambient air quality standards of chapter
33.1-15-02, including hydrogen sulfide and sulfur dioxide; the class I and class II increments
for sulfur dioxide, nitrogen dioxide, and particulate matter of chapter 33.1-15-15, if applicable;
the odor concentration limits of chapter 33.1-15-16; and any other applicable chapter of this
article. For the purpose of this chapter, compliance must be determined outside the surface
boundary of the production facility.
6.
When a malfunction, the correction of a malfunction, or maintenance at any oil and gas well
production facility occurs that can be expected to cause the emission of air contaminants in
violation of this article for longer than twenty-four hours, the person responsible for such
installation shall notify the department of such malfunction or maintenance as set forth in
section 33.1-15-01-13. This subsection pertains only to the reporting of malfunctions and
maintenance and does not obviate the source's responsibility to comply with the remainder of
this chapter or article.
7.
The owner or operator of any oil and gas well production facility completed prior to the
effective date of section 33.1-15-20-04 shall comply with the requirements of this chapter
within six months of the effective date of these revisions. The owner or operator of any oil and
gas well production facility completed after the effective date of the revisions to section
33.1-15-20-04 shall comply with the requirements of this chapter within ninety days of the
completion of the well.