1.
Notification.
a.
Notification of commencement of lead-based paint abatement activities in a residential
dwelling or child-occupied facility or as a result of a federal, state, or local order shall be
given to the department ten days prior to the commencement of the abatement activities.
The notification shall be provided on a form provided by the department.
b.
Notification of all lead-based paint accredited training courses offered in North Dakota
shall be provided to the department at least ten days prior to the commencement of the
course. Notification of completion of the course shall be provided to the department
within ten days after the course has been completed. Both notifications shall be provided
on a form provided by the department.
2.
Notification requirements. Each owner or operator to which this chapter applies shall:
a.
Provide the department with written notice of intent to abate lead-based paint.
b.
Indicate whether the notice is original or a revised notification and update the notice as
necessary, including but not limited to:
(1)
Update notification for new start dates.
(2)
Update notification for change in job location.
(3)
Update notification for cancellations.
c.
Postmark or deliver the notice as follows:
(1)
At least ten working days before abatement begins.
(2)
As early as possible before, but not later than, the following working day after
abatement begins if the abatement is the result of an order from a federal, state, or
local government.
3.
Required information. Each owner or operator to which this chapter applies shall include the
following information in the notification required by subsection 1:
a.
The name, address, and telephone number of the owner of the facility.
b.
The name, address, and telephone number of the abatement company.
c.
A description of the facility or the affected part of the facility being abated, including the
size, age, and present use of the facility.
d.
An estimate of the amount of lead-based paint to be abated from the facility in terms of
square feet.
e.
The location of the facility being abated, including the street address, city, county, and
state if different from that required by subdivision a.
f.
The scheduled starting date and completion date of the abatement work.
g.
A description of the abatement work to be performed, including the abatement
techniques and methods to be employed during the activities and a description of the
affected facility components.
h.
The name and location of the waste disposal site where the lead-based paint containing
waste material will be deposited.
i.
The name, address, and telephone number of the waste transporter.
j.
A signed statement by the lead-based paint contractor that all lead-based paint
abatement supervisors and lead-based paint workers assigned to this project are
certified by the department, in accordance with section 33.1-15-24-04.