NDAC 33.1-16-03.1-10
Enforcement and compliance
Cite as N.D. Admin. Code ยง 33.1-16-03.1-10
1.
The department shall evaluate all reports, notifications, and data submitted by an operator in
compliance with this chapter and the state animal feeding operation permit. The department
shall investigate all apparent violations for possible enforcement action pursuant to North
Dakota Century Code section 61-28-08.
2.
No person may knowingly make a false statement, representation, or certification in any
application, record, report, plan, or other document filed or required under this chapter or the
permit. No person may knowingly falsify, tamper with, or provide inaccurate information
regarding a monitoring well or other device required under this chapter or the permit.
3.
Operators of permitted facilities that are not operating properly shall update those facilities to
achieve compliance with this chapter and the conditions of the permit within a timeframe
approved by the department.
4.
If the department finds that a facility, which has not been covered by a state animal feeding
operation permit within the last five years, is causing or is likely to cause pollution of waters of
the state, or poses a significant threat to public health or safety, the operator will be notified
that actions shall be taken to prevent the pollution.
5.
Within one hundred and twenty days following the notification described in subsection 4, the
operator shall submit a compliance plan to prevent the facility from impacting waters of the
state.
a.
The compliance plan shall be prepared in accordance with the minimum requirements of
this chapter and the North Dakota Livestock Program Design Manual. The plan shall
contain adequate information to enable the department to determine whether the
proposed measures will abate or prevent pollution of waters of the state. The operator
also shall present a proposed schedule for plan implementation and completion.
b.
If the compliance plan allows for operation of the facility in a manner that will not cause
nor likely cause pollution of waters of the state, the department will issue a permit with a
compliance schedule for construction. Approval of the permit shall be contingent upon
any changes which may be required by the department after its review of the proposed
plan. The construction must be completed within the timeframe specified in the
compliance schedule.
c.
If the approved compliance plan needs to be modified or amended during construction,
the operator shall notify the department prior to making any modifications or
amendments and they must be approved by the department.
6.
A permit may be modified, suspended, revoked, or denied by the department for reasons
pertaining to: circumstances which do not meet the purpose and provisions of this article, the
provisions of the permit, or the plans and specifications submitted as part of the application for
permit; or, violations of any applicable laws or rules. The department shall provide written
notice to the permittee.
7.
If the department revokes a state animal feeding operation permit for cause, the operator can
finish feeding the animals for up to one hundred and twenty days from the date of revocation,
provided public and environmental health are not threatened. The operator will not be allowed
to bring any other animals into the facility until the requirements of the permit, this chapter,
and the North Dakota Livestock Program Design Manual have been met as approved by the
department.