NDAC 33.1-20-04.1-09
General disposal standards
Cite as N.D. Admin. Code ยง 33.1-20-04.1-09
1.
In addition to sections 33.1-20-04.1-02, 33.1-20-04.1-03, 33.1-20-04.1-04, and
33.1-20-04.1-05, the standards of this section apply to all landfills, surface impoundments
closed with solid waste in place, and land treatment units, unless otherwise indicated.
2.
Construction and operation standards for solid waste management facilities regulated by this
section:
a.
Every solid waste landfill or facility must have and maintain, or have access to,
equipment adequate for the excavation, compaction, covering, surface water
management, and monitoring procedures required by approval plans and this article.
b.
Roads must be constructed and maintained to provide access to the facility. Access
roads must be cleaned and decontaminated as necessary.
c.
There must be available an adequate supply of suitable cover material, which, if
necessary, must be stockpiled and protected for winter operation.
d.
The final cover of all disposal facilities must be designed and constructed in a manner
that ensures the quality and integrity of the hydraulic barrier and the protective vegetative
cover.
e.
The working face or open area of a landfill must be limited in size to as small an area as
practicable. Sequential partial closure must be implemented as necessary to keep the
disposal area as small as practicable and to close filled areas in a timely manner.
f.
All disposal facilities must identify, quantify, remove, stockpile, and maintain suitable plant
growth material for later use in closure.
g.
Any recycling or salvage activity must be authorized by the owner or operator and must
be in a separate area in a manner to avoid injury and interference with the landfill
operation.
h.
Vehicles, farm machinery, metal appliances, mobile homes, trailers, or other similar items
brought to the facility for recycling may be stored temporarily in a separate area.
i.
Vector control measures, in addition to the application of cover material, must be
instituted whenever necessary to prevent the transmission of disease, prevent bird
hazards to aircraft, and otherwise prevent and reduce hazards created by rats, flies,
snakes, insects, birds, cats, dogs, and skunks.
j.
All domestic animals must be excluded from the facility. Feeding of garbage to animals is
prohibited.
k.
All earthen material must be maintained onsite unless removal from the site is authorized
by the department.
3.
Construction and operation standards, excluding inert waste landfills.
a.
The landfill must be designed and operated to prevent the run-on and runoff of surface
waters resulting from a maximum flow of a twenty-five-year, twenty-four-hour storm.
b.
Facilities receiving on average over twenty tons [18.2 metric tons] per day of solid waste
shall make provisions for measuring all waste delivered to and disposed in the facility.
Weight measurements are preferable; volume measurements (cubic yards) are
acceptable.
c.
Active areas of the landfill must be surveyed periodically to ensure that filling is
proceeding in a manner consistent with the landfill design and that closure grades are not
exceeded.
d.
All run-on or runoff must be properly controlled to avoid its concentration on or in solid
waste and to minimize infiltration into the waste material. Disposal must avoid any areas
within the facility where run-on or runoff accumulates.
e.
Leachate removal systems must be operated and maintained to assure continued
function according to the design efficiency. This must include, where applicable:
(1)
Flushing, inspection and, if necessary, repair of collection lines after placement of
the first layer of waste in a landfill cell;
(2)
Annual sampling and analysis of leachate for the parameters required under the
ground water quality monitoring required under section 33.1-20-13-02;
(3)
At minimum, semiannual monitoring of leachate head or elevations above the liner;
(4)
Annual flushing of leachate collection lines to remove dirt and scale; and
(5)
Inclusion of leachate removal system operation, inspection, and maintenance
procedures in the operating record.
f.
No composite liner may be exposed to freezing more than one winter season, excluding
composite liners in surface impoundments. At least three feet [0.91 meters] of solid waste
or other material approved by the department must be placed above the upper drainage
layer on all lined areas by December first. No disposal may take place after December
first in areas that have not met this requirement without first testing the composite liner's
integrity and receiving approval from the department.
4.
Closure standards, excluding land treatment units.
a.
Closed solid waste management units may not be used for cultivated crops, heavy
grazing, buildings, or any other use which might disturb the protective vegetative and soil
cover.
b.
All solid waste management units must be closed with a final cover designed to:
(1)
Limit the amount of percolation that may enter the waste to meet the efficiency
requirements for that type of solid waste management unit;
(2)
Minimize precipitation run-on from adjacent areas;
(3)
Minimize erosion and optimize drainage of precipitation falling on the landfill. The
grade of slopes may not be less than three percent, nor more than fifteen percent,
unless the applicant or permittee provides justification to show steeper slopes are
stable and will not result in long-term surface soil loss in excess of two tons [1.82
metric tons] per acre per year. In no instance may slopes exceed twenty-five
percent, including exterior slope of any swales or drainage structures; and
(4)
Provide a surface drainage system which does not adversely affect drainage from
adjacent lands.
c.
The final cover must include six inches [15.2 centimeters] or more of suitable plant
growth material which must be seeded with shallow rooted grass or native vegetation.
d.
The department may allow, on a case-by-case basis, the use of closed inert waste landfill
sites for certain beneficial uses that would not pose a threat to human health or the
environment.
5.
Postclosure standards for solid waste management facilities regulated by this section.
a.
During the postclosure period, the owner or operator of a landfill or a surface
impoundment closed with solid waste in place shall:
(1)
Maintain the integrity and effectiveness of the final cover, including making repairs
to the cover to correct effects of settlement, subsidence, and other events, and
preventing run-on and runoff from eroding or otherwise damaging the final cover;
(2)
Maintain and operate the leachate collection system, if applicable;
(3)
Monitor the ground water and maintain the ground water monitoring system, if
applicable; and
(4)
Operate and maintain the gas control system, if applicable.
b.
The owner or operator of a municipal waste landfill, an industrial waste landfill, a special
waste landfill, a surface impoundment closed with solid waste remaining in place, or a
land treatment facility shall prepare and implement a written postclosure plan approved
by the department as a part of the permitting process. The postclosure plan must
address facility maintenance and monitoring activities for a postclosure period of thirty
years.
(1)
Postclosure includes appropriate ground water monitoring; surface water
monitoring; gas monitoring; and maintenance of the facility, facility structures, and
ground water monitoring systems.
(2)
The postclosure plan must provide the name, address, and telephone number of the
person or office to contact during the postclosure period; and project time intervals
at which postclosure activities are to be implemented, identify postclosure cost
estimates, and provide financial assurance mechanisms as required by chapter
33.1-20-14.
(3)
The department may require an owner or operator to amend the postclosure plan,
including an extension of the postclosure period, and implement the changes. If the
permittee demonstrates that the facility is stabilized, the department may authorize
the owner or operator to discontinue postclosure activities.
c.
Following completion of the postclosure period, the owner or operator shall notify the
department verifying that postclosure management has been completed in accordance
with the postclosure plan.