NDAC 33.1-20-14-02
Cost estimates for closure and postclosure
Cite as N.D. Admin. Code ยง 33.1-20-14-02
1.
Each owner or operator shall prepare separate written closure and postclosure estimates of
the costs of hiring a third party to complete identified activities of the facility closure and
postclosure plans.
a.
The initial cost estimates must be in current dollars, and cost estimates must be adjusted
annually for inflation.
b.
The cost estimate for closure must equal the cost of closing the largest area requiring a
final cover during the active life of the facility.
c.
The owner or operator shall increase the cost estimates if changes in the closure plan or
postclosure plan increase the maximum costs of closure or postclosure care,
respectively. The owner or operator may reduce a cost estimate for closure if it exceeds
the maximum costs of closure during the remaining life of the facility or a cost estimate
for postclosure care if it exceeds the maximum costs of postclosure during the remaining
postclosure period.
d.
The cost estimate for postclosure must account for the total costs of postclosure care
over the entire postclosure period, including the most expensive costs of postclosure
during the postclosure period.
2.
Each owner or operator shall prepare a new closure or postclosure cost estimate whenever
any of the following occurs:
a.
Changes in operating plans or facility design affect the closure or postclosure plans;
b.
There is a change in the expected year of closure; or
c.
The department directs the owner or operator to revise the closure or postclosure plan.