NDAC 33.1-24-02-204
Standards - Tanks
Cite as N.D. Admin. Code § 33.1-24-02-204
1.
The provisions of this section apply to the control of air pollutant emissions from tanks for
which subsection 2 of section 33.1-24-02-202 references the use of this section for such air
emission control.
2.
The remanufacturer or other person that stores or treats the hazardous secondary material
shall control air pollutant emissions from each tank subject to this section in accordance with
the following requirements as applicable:
a.
For a tank that manages hazardous secondary material that meets all of the conditions
specified in paragraphs 1 through 2, the remanufacturer or other person that stores or
treats the hazardous secondary material shall control air pollutant emissions from the
tank in accordance with the tank level 1 controls specified in subsection 3 or the tank
level 2 controls specified in subsection 4.
(1)
The hazardous secondary material in the tank has a maximum organic vapor
pressure which is less than the maximum organic vapor pressure limit for the tank's
design capacity category as follows:
(a)
For a tank design capacity equal to or greater than one hundred
fifty-one meters3 (5,330 feet3), the maximum organic vapor pressure limit for
the tank is five and two-tenths kilopascals.
(b)
For a tank design capacity equal to or greater than seventy-five meters3
(2,650 feet3) but less than one hundred fifty-one meters3 (5,330 feet3), the
maximum organic vapor pressure limit for the tank is twenty-seven and
six-tenths kilopascals.
(c)
For a tank design capacity less than seventy-five meters3 (2,650 feet3), the
maximum organic vapor pressure limit for the tank is seventy-six and six-tenths
kilopascals.
(2)
The hazardous secondary material in the tank is not heated by the remanufacturer
or other person that stores or treats the hazardous secondary material to a
temperature that is greater than the temperature at which the maximum organic
vapor pressure of the hazardous secondary material is determined for the purpose
of complying with paragraph 1.
b.
For a tank that manages hazardous secondary material which does not meet all of the
conditions specified in paragraphs 1 through 2 of subdivision a, the remanufacturer or
other person that stores or treats the hazardous secondary material shall control air
pollutant emissions from the tank by using tank level 2 controls in accordance with the
requirements of subsection 4. An example of tanks required to use tank level 2 controls is
a tank for which the hazardous secondary material in the tank has a maximum organic
vapor pressure that is equal to or greater than the maximum organic vapor pressure limit
for the tank's design capacity category as specified in paragraph 1 of subdivision a.
3.
Remanufacturers or other persons that store or treat the hazardous secondary material
controlling air pollutant emissions from a tank using tank level 1 controls shall meet the
requirements specified in subdivisions a through d:
a.
The remanufacturer or other person that stores or treats that hazardous secondary
material shall determine the maximum organic vapor pressure for a hazardous
secondary material to be managed in the tank using tank level 1 controls before the first
time the hazardous secondary material is placed in the tank. The maximum organic
vapor pressure must be determined using the procedures specified in subsection 3 of
section 33.1-24-02-203. Thereafter, the remanufacturer or other person that stores or
treats the hazardous secondary material shall perform a new determination whenever
changes to the hazardous secondary material managed in the tank could potentially
cause the maximum organic vapor pressure to increase to a level that is equal to or
greater than the maximum organic vapor pressure limit for the tank design capacity
category specified in paragraph 1 of subdivision a of subsection 2, as applicable to the
tank.
b.
The tank must be equipped with a fixed roof designed to meet the following
specifications:
(1)
The fixed roof and its closure devices must be designed to form a continuous barrier
over the entire surface area of the hazardous secondary material in the tank. The
fixed roof may be a separate cover installed on the tank (for example, a removable
cover mounted on an open-top tank) or may be an integral part of the tank structural
design (for example, a horizontal cylindrical tank equipped with a hatch).
(2)
The fixed roof must be installed in a manner such that there are no visible cracks,
holes, gaps, or other open spaces between roof section joints or between the
interface of the roof edge and the tank wall.
(3)
Each opening in the fixed roof, and any manifold system associated with the fixed
roof, must be either:
(a)
Equipped with a closure device designed to operate such that when the
closure device is secured in the closed position there are no visible cracks,
holes, gaps, or other open spaces in the closure device or between the
perimeter of the opening and the closure device; or
(b)
Connected by a closed-vent system that is vented to a control device. The
control device must remove or destroy organics in the vent stream, and must
be operating whenever hazardous secondary material is managed in the tank,
except as provided for in items 1 and 2.
[1]
During periods when it is necessary to provide access to the tank for
performing the activities of item 2, venting of the vapor headspace
underneath the fixed roof to the control device is not required, opening of
closure devices is allowed, and removal of the fixed roof is allowed.
Following completion of the activity, the remanufacturer or other person
that stores or treats the hazardous secondary material promptly shall
secure the closure device in the closed position or reinstall the cover, as
applicable, and resume operation of the control device.
[2]
During periods of routine inspection, maintenance, or other activities
needed for normal operations, and for removal of accumulated sludge or
other residues from the bottom of the tank.
(4)
The fixed roof and its closure devices must be made of suitable materials that will
minimize exposure of the hazardous secondary material to the atmosphere, to the
extent practical, and will maintain the integrity of the fixed roof and closure devices
throughout their intended service life. Factors to be considered when selecting the
materials for and designing the fixed roof and closure devices include: organic vapor
permeability, the effects of any contact with the hazardous secondary material or its
vapors managed in the tank; the effects of outdoor exposure to wind, moisture, and
sunlight; and the operating practices used for the tank on which the fixed roof is
installed.
c.
Whenever a hazardous secondary material is in the tank, the fixed roof must be installed
with each closure device secured in the closed position except as follows:
(1)
Opening of closure devices or removal of the fixed roof is allowed at the following
times:
(a)
To provide access to the tank for performing routine inspection, maintenance,
or other activities needed for normal operations. Examples of such activities
include those times when a worker needs to open a port to sample the liquid in
the tank, or when a worker needs to open a hatch to maintain or repair
equipment. Following completion of the activity, the remanufacturer or other
person that stores or treats the hazardous secondary material promptly shall
secure the closure device in the closed position or reinstall the cover, as
applicable, to the tank.
(b)
To remove accumulated sludge or other residues from the bottom of tank.
(2)
Opening of a spring-loaded pressure-vacuum relief valve, conservation vent, or
similar type of pressure relief device which vents to the atmosphere is allowed
during normal operations for the purpose of maintaining the tank internal pressure in
accordance with the tank design specifications. The device must be designed to
operate with no detectable organic emissions when the device is secured in the
closed position. The settings at which the device opens must be established such
that the device remains in the closed position whenever the tank internal pressure is
within the internal pressure operating range determined by the remanufacturer or
other person that stores or treats the hazardous secondary material based on the
tank manufacturer recommendations, applicable regulations, fire protection and
prevention codes, standard engineering codes and practices, or other requirements
for the safe handling of flammable, ignitable, explosive, reactive, or hazardous
materials. Examples of normal operating conditions that may require these devices
to open are during those times when the tank internal pressure exceeds the internal
pressure operating range for the tank as a result of loading operations or diurnal
ambient temperature fluctuations.
(3)
Opening of a safety device, as defined in section 33.1-24-02-201, is allowed at any
time conditions require doing so to avoid an unsafe condition.
d.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect the air emission control equipment in accordance with the following
requirements:
(1)
The fixed roof and its closure devices must be visually inspected by the
remanufacturer or other person that stores or treats the hazardous secondary
material to check for defects that could result in air pollutant emissions. Defects
include visible cracks, holes, or gaps in the roof sections or between the roof and
the tank wall; broken, cracked, or otherwise damaged seals or gaskets on closure
devices; and broken or missing hatches, access covers, caps, or other closure
devices.
(2)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall perform an initial inspection of the fixed roof and its closure devices
on or before the date that the tank becomes subject to this section. Thereafter, the
remanufacturer or other person that stores or treats the hazardous secondary
material shall perform the inspections at least once every year except under the
special conditions provided for in subsection 12.
(3)
In the event that a defect is detected, the remanufacturer or other person that stores
or treats the hazardous secondary material shall repair the defect in accordance
with the requirements of subsection 11.
(4)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall maintain a record of the inspection in accordance with the
requirements specified in subsection 2 of section 33.1-24-02-209.
4.
Remanufacturers or other persons that store or treat the hazardous secondary material
controlling air pollutant emissions from a tank using tank level 2 controls shall use one of the
following tanks:
a.
A fixed-roof tank equipped with an internal floating roof in accordance with the
requirements specified in subsection 5;
b.
A tank equipped with an external floating roof in accordance with the requirements
specified in subsection 6;
c.
A tank vented through a closed-vent system to a control device in accordance with the
requirements specified in subsection 7;
d.
A pressure tank designed and operated in accordance with the requirements specified in
subsection 8; or
e.
A tank located inside an enclosure that is vented through a closed-vent system to an
enclosed combustion control device in accordance with the requirements specified in
subsection 9.
5.
The remanufacturer or other person that stores or treats the hazardous secondary material
who controls air pollutant emissions from a tank using a fixed roof with an internal floating roof
shall meet the requirements specified in subdivisions a through c.
a.
The tank must be equipped with a fixed roof and an internal floating roof in accordance
with the following requirements:
(1)
The internal floating roof must be designed to float on the liquid surface except
when the floating roof must be supported by the leg supports.
(2)
The internal floating roof must be equipped with a continuous seal between the wall
of the tank and the floating roof edge that meets either of the following
requirements:
(a)
A single continuous seal that is either a liquid-mounted seal or a metallic shoe
seal, as defined in section 33.1-24-02-201; or
(b)
Two continuous seals mounted one above the other. The lower seal may be a
vapor-mounted seal.
(3)
The internal floating roof must meet the following specifications:
(a)
Each opening in a noncontact internal floating roof except for automatic
bleeder vents (vacuum breaker vents) and the rim space vents is to provide a
projection below the liquid surface.
(b)
Each opening in the internal floating roof must be equipped with a gasketed
cover or a gasketed lid except for leg sleeves, automatic bleeder vents, rim
space vents, column wells, ladder wells, sample wells, and stub drains.
(c)
Each penetration of the internal floating roof for the purpose of sampling must
have a slit fabric cover that covers at least ninety percent of the opening.
(d)
Each automatic bleeder vent and rim space vent must be gasketed.
(e)
Each penetration of the internal floating roof that allows for passage of a ladder
must have a gasketed sliding cover.
(f)
Each penetration of the internal floating roof that allows for passage of a
column supporting the fixed roof must have a flexible fabric sleeve seal or a
gasketed sliding cover.
b.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall operate the tank in accordance with the following requirements:
(1)
When the floating roof is resting on the leg supports, the process of filling, emptying,
or refilling must be continuous and shall be completed as soon as practical.
(2)
Automatic bleeder vents are to be set closed at all times when the roof is floating,
except when the roof is being floated off or is being landed on the leg supports.
(3)
Prior to filling the tank, each cover, access hatch, gauge float well, or lid on any
opening in the internal floating roof must be bolted or fastened closed (for example,
no visible gaps). Rim space vents are to be set to open only when the internal
floating roof is not floating or when the pressure beneath the rim exceeds the
manufacturer's recommended setting.
c.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect the internal floating roof in accordance with the procedures
specified as follows:
(1)
The floating roof and its closure devices must be visually inspected by the
remanufacturer or other person that stores or treats the hazardous secondary
material to check for defects that could result in air pollutant emissions. Defects
include: the internal floating roof is not floating on the surface of the liquid inside the
tank; liquid has accumulated on top of the internal floating roof; any portion of the
roof seals have detached from the roof rim; holes, tears, or other openings are
visible in the seal fabric; the gaskets no longer close off the hazardous secondary
material surface from the atmosphere; or the slotted membrane has more than
ten percent open area.
(2)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect the internal floating roof components as follows except as
provided in paragraph 3:
(a)
Visually inspect the internal floating roof components through openings on the
fixed roof (for example, manholes and roof hatches) at least once every twelve
months after initial fill; and
(b)
Visually inspect the internal floating roof, primary seal, secondary seal (if one is
in service), gaskets, slotted membranes, and sleeve seals (if any) each time
the tank is emptied and degassed and at least every ten years.
(3)
As an alternative to performing the inspections specified in paragraph 2 for an
internal floating roof equipped with two continuous seals mounted one above the
other, the remanufacturer or other person that stores or treats the hazardous
secondary material may visually inspect the internal floating roof, primary and
secondary seals, gaskets, slotted membranes, and sleeve seals (if any) each time
the tank is emptied and degassed and at least every five years.
(4)
Prior to each inspection required by paragraph 2 or 3, the remanufacturer or other
person that stores or treats the hazardous secondary material shall notify the
department in advance of each inspection to provide the department with the
opportunity to have an observer present during the inspection. The remanufacturer
or other person that stores or treats the hazardous secondary material shall notify
the department of the date and location of the inspection as follows:
(a)
Prior to each visual inspection of an internal floating roof in a tank that has
been emptied and degassed, written notification must be prepared and sent by
the remanufacturer or other person that stores or treats the hazardous
secondary material so that it is received by the department at least thirty
calendar days before refilling the tank except when an inspection is not
planned as provided for in subparagraph b.
(b)
When a visual inspection is not planned and the remanufacturer or other
person that stores or treats the hazardous secondary material could not have
known about the inspection thirty calendar days before refilling the tank, the
remanufacturer or other person that stores or treats the hazardous secondary
material shall notify the department as soon as possible, but no later than
seven calendar days before refilling of the tank. This notification may be made
by telephone and immediately followed by a written explanation for why the
inspection is unplanned. Alternatively, written notification, including the
explanation for the unplanned inspection, may be sent so that it is received by
the department at least seven calendar days before refilling the tank.
(5)
In the event that a defect is detected, the remanufacturer or other person that stores
or treats the hazardous secondary material shall repair the defect in accordance
with the requirements of subsection 11.
(6)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall maintain a record of the inspection in accordance with the
requirements specified in subsection 2 of section 33.1-24-02-209.
d.
Safety devices, as defined in section 33.1-24-02-201, may be installed and operated as
necessary on any tank complying with the requirements of this subsection.
6.
The remanufacturer or other person that stores or treats the hazardous secondary material
who controls air pollutant emissions from a tank using an external floating roof shall meet the
requirements specified in subdivisions a through c.
a.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall design the external floating roof in accordance with the following
requirements:
(1)
The external floating roof must be designed to float on the liquid surface except
when the floating roof must be supported by the leg supports.
(2)
The floating roof must be equipped with two continuous seals, one above the other,
between the wall of the tank and the roof edge. The lower seal is referred to as the
primary seal, and the upper seal is referred to as the secondary seal.
(a)
The primary seal must be a liquid-mounted seal or a metallic shoe seal, as
defined in section 33.1-24-02-201. The total area of the gaps between the tank
wall and the primary seal may not exceed two hundred twelve square
centimeters per meter (10.0 square inches per foot) of tank diameter, and the
width of any portion of these gaps may not exceed three and eight-tenths
centimeters (1.5 inches). If a metallic shoe seal is used for the primary seal,
the metallic shoe seal must be designed so that one end extends into the liquid
in the tank and the other end extends a vertical distance of at least sixty-one
centimeters above the liquid surface.
(b)
The secondary seal must be mounted above the primary seal and cover the
annular space between the floating roof and the wall of the tank. The total area
of the gaps between the tank wall and the secondary seal may not exceed
twenty-one and two-tenths square centimeters per meter (1.0 square inches
per foot) of tank diameter, and the width of any portion of these gaps shall not
exceed one and three-tenths centimeters (0.5 inches).
(3)
The external floating roof must meet the following specifications:
(a)
Except for automatic bleeder vents (vacuum breaker vents) and rim space
vents, each opening in a noncontact external floating roof must provide a
projection below the liquid surface.
(b)
Except for automatic bleeder vents, rim space vents, roof drains, and leg
sleeves, each opening in the roof must be equipped with a gasketed cover,
seal, or lid.
(c)
Each access hatch and each gauge float well must be equipped with a cover
designed to be bolted or fastened when the cover is secured in the closed
position.
(d)
Each automatic bleeder vent and each rim space vent must be equipped with a
gasket.
(e)
Each roof drain that empties into the liquid managed in the tank must be
equipped with a slotted membrane fabric cover that covers at least ninety
percent of the area of the opening.
(f)
Each unslotted and slotted guide pole well must be equipped with a gasketed
sliding cover or a flexible fabric sleeve seal.
(g)
Each unslotted guide pole must be equipped with a gasketed cap on the end of
the pole.
(h)
Each slotted guide pole must be equipped with a gasketed float or other device
which closes off the liquid surface from the atmosphere.
(i)
Each gauge hatch and each sample well must be equipped with a gasketed
cover.
b.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall operate the tank in accordance with the following requirements:
(1)
When the floating roof is resting on the leg supports, the process of filling, emptying,
or refilling must be continuous and must be completed as soon as practical.
(2)
Except for automatic bleeder vents, rim space vents, roof drains, and leg sleeves,
each opening in the roof must be secured and maintained in a closed position at all
times except when the closure device must be open for access.
(3)
Covers on each access hatch and each gauge float well must be bolted or fastened
when secured in the closed position.
(4)
Automatic bleeder vents must be set closed at all times when the roof is floating,
except when the roof is being floated off or is being landed on the leg supports.
(5)
Rim space vents must be set to open only at those times that the roof is being
floated off the roof leg supports or when the pressure beneath the rim seal exceeds
the manufacturer's recommended setting.
(6)
The cap on the end of each unslotted guide pole must be secured in the closed
position at all times except when measuring the level or collecting samples of the
liquid in the tank.
(7)
The cover on each gauge hatch or sample well must be secured in the closed
position at all times except when the hatch or well must be opened for access.
(8)
Both the primary seal and the secondary seal must completely cover the annular
space between the external floating roof and the wall of the tank in a continuous
fashion except during inspections.
c.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect the external floating roof in accordance with the procedures
specified as follows:
(1)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall measure the external floating roof seal gaps in accordance with the
following requirements:
(a)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall perform measurements of gaps between the tank wall
and the primary seal within sixty calendar days after initial operation of the tank
following installation of the floating roof and, thereafter, at least once every
five years.
(b)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall perform measurements of gaps between the tank wall
and the secondary seal within sixty calendar days after initial operation of the
tank following installation of the floating roof and, thereafter, at least once
every year.
(c)
If a tank ceases to hold hazardous secondary material for a period of one year
or more, subsequent introduction of hazardous secondary material into the
tank must be considered an initial operation for the purposes of
subparagraphs a and b.
(d)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall determine the total surface area of gaps in the
primary seal and in the secondary seal individually using the following
procedure:
[1]
The seal gap measurements must be performed at one or more floating
roof levels when the roof is floating off the roof supports.
[2]
Seal gaps, if any, must be measured around the entire perimeter of the
floating roof in each place where a thirty-two one-hundredths centimeter
(0.125 inch) diameter uniform probe passes freely (without forcing or
binding against the seal) between the seal and the wall of the tank and
measure the circumferential distance of each such location.
[3]
For a seal gap measured under this subdivision, the gap surface area
must be determined by using probes of various widths to measure
accurately the actual distance from the tank wall to the seal and
multiplying each such width by its respective circumferential distance.
[4]
The total gap area must be calculated by adding the gap surface areas
determined for each identified gap location for the primary seal and the
secondary seal individually, and then dividing the sum for each seal type
by the nominal diameter of the tank. These total gap areas for the primary
seal and secondary seal are then compared to the respective standards
for the seal type as specified in paragraph 2 of subdivision a.
(e)
In the event that the seal gap measurements do not conform to the
specifications in paragraph 2 of subdivision a, the remanufacturer or other
person that stores or treats the hazardous secondary material shall repair the
defect in accordance with the requirements of subsection 11.
(f)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall maintain a record of the inspection in accordance with
the requirements specified in subsection 2 of section 33.1-24-02-209.
(2)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall visually inspect the external floating roof in accordance with the
following requirements:
(a)
The floating roof and its closure devices must be visually inspected by the
remanufacturer or other person that stores or treats the hazardous secondary
material to check for defects that could result in air pollutant emissions.
Defects include: holes, tears, or other openings in the rim seal or seal fabric of
the floating roof; a rim seal detached from the floating roof; all or a portion of
the floating roof deck being submerged below the surface of the liquid in the
tank; broken, cracked, or otherwise damaged seals or gaskets on closure
devices; and broken or missing hatches, access covers, caps, or other closure
devices.
(b)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall perform an initial inspection of the external floating
roof and its closure devices on or before the date that the tank becomes
subject to this section. Thereafter, the remanufacturer or other person that
stores or treats the hazardous secondary material shall perform the
inspections at least once every year except for the special conditions provided
for in subsection 12.
(c)
In the event that a defect is detected, the remanufacturer or other person that
stores or treats the hazardous secondary material shall repair the defect in
accordance with the requirements of subsection 11.
(d)
The remanufacturer or other person that stores or treats the hazardous
secondary material shall maintain a record of the inspection in accordance with
the requirements specified in subsection 2 of section 33.1-24-02-209.
(3)
Prior to each inspection required by paragraph 1 or 2, the remanufacturer or other
person that stores or treats the hazardous secondary material shall notify the
department in advance of each inspection to provide the department with the
opportunity to have an observer present during the inspection. The remanufacturer
or other person that stores or treats the hazardous secondary material shall notify
the department of the date and location of the inspection as follows:
(a)
Prior to each inspection to measure external floating roof seal gaps as required
under paragraph 1, written notification must be prepared and sent by the
remanufacturer or other person that stores or treats the hazardous secondary
material so that it is received by the department at least thirty calendar days
before the date the measurements are scheduled to be performed.
(b)
Prior to each visual inspection of an external floating roof in a tank that has
been emptied and degassed, written notification must be prepared and sent by
the remanufacturer or other person that stores or treats the hazardous
secondary material so that it is received by the department at least thirty
calendar days before refilling the tank except when an inspection is not
planned as provided for in subparagraph c.
(c)
When a visual inspection is not planned and the remanufacturer or other
person that stores or treats the hazardous secondary material could not have
known about the inspection thirty calendar days before refilling the tank, the
owner or operator shall notify the department as soon as possible, but no later
than seven calendar days before refilling of the tank. This notification may be
made by telephone and immediately followed by a written explanation for why
the inspection is unplanned. Alternatively, written notification, including the
explanation for the unplanned inspection, may be sent so that it is received by
the department at least seven calendar days before refilling the tank.
d.
Safety devices, as defined in section 33.1-24-02-201, may be installed and operated as
necessary on any tank complying with the requirements of this subsection.
7.
The remanufacturer or other person that stores or treats the hazardous secondary material
who controls air pollutant emissions from a tank by venting the tank to a control device shall
meet the requirements specified in subdivisions a through c.
a.
The tank must be covered by a fixed roof and vented directly through a closed-vent
system to a control device in accordance with the following requirements:
(1)
The fixed roof and its closure devices shall be designed to form a continuous barrier
over the entire surface area of the liquid in the tank.
(2)
Each opening in the fixed roof not vented to the control device must be equipped
with a closure device. If the pressure in the vapor headspace underneath the fixed
roof is less than atmospheric pressure when the control device is operating, the
closure devices must be designed to operate such that when the closure device is
secured in the closed position there are no visible cracks, holes, gaps, or other open
spaces in the closure device or between the perimeter of the cover opening and the
closure device. If the pressure in the vapor headspace underneath the fixed roof is
equal to or greater than atmospheric pressure when the control device is operating,
the closure device must be designed to operate with no detectable organic
emissions.
(3)
The fixed roof and its closure devices must be made of suitable materials that will
minimize exposure of the hazardous secondary material to the atmosphere, to the
extent practical, and will maintain the integrity of the fixed roof and closure devices
throughout their intended service life. Factors to be considered when selecting the
materials for and designing the fixed roof and closure devices include: organic vapor
permeability, the effects of any contact with the liquid and its vapor managed in the
tank; the effects of outdoor exposure to wind, moisture, and sunlight; and the
operating practices used for the tank on which the fixed roof is installed.
(4)
The closed-vent system and control device must be designed and operated in
accordance with the requirements of section 33.1-24-02-207.
b.
Whenever a hazardous secondary material is in the tank, the fixed roof must be installed
with each closure device secured in the closed position and the vapor headspace
underneath the fixed roof vented to the control device except as follows:
(1)
Venting to the control device is not required, and opening of closure devices or
removal of the fixed roof is allowed at the following times:
(a)
To provide access to the tank for performing routine inspection, maintenance,
or other activities needed for normal operations. Examples of such activities
include those times when a worker needs to open a port to sample liquid in the
tank, or when a worker needs to open a hatch to maintain or repair equipment.
Following completion of the activity, the remanufacturer or other person that
stores or treats the hazardous secondary material promptly shall secure the
closure device in the closed position or reinstall the cover, as applicable, to the
tank.
(b)
To remove accumulated sludge or other residues from the bottom of a tank.
(2)
Opening of a safety device, as defined in section 33.1-24-02-201, is allowed at any
time conditions require doing so to avoid an unsafe condition.
c.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect and monitor the air emission control equipment in accordance with
the following procedures:
(1)
The fixed roof and its closure devices must be visually inspected by the
remanufacturer or other person that stores or treats the hazardous secondary
material to check for defects that could result in air pollutant emissions. Defects
include: visible cracks, holes, or gaps in the roof sections or between the roof and
the tank wall; broken, cracked, or otherwise damaged seals or gaskets on closure
devices; and broken or missing hatches, access covers, caps, or other closure
devices.
(2)
The closed-vent system and control device must be inspected and monitored by the
remanufacturer or other person that stores or treats the hazardous secondary
material in accordance with the procedures specified in section 33.1-24-02-207.
(3)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall perform an initial inspection of the air emission control equipment on
or before the date that the tank becomes subject to this section. Thereafter, the
remanufacturer or other person that stores or treats the hazardous secondary
material shall perform the inspections at least once every year except for the special
conditions provided for in subsection 12.
(4)
In the event that a defect is detected, the remanufacturer or other person that stores
or treats the hazardous secondary material shall repair the defect in accordance
with the requirements of subsection 11.
(5)
The remanufacturer or other person that stores or treats the hazardous secondary
material shall maintain a record of the inspection in accordance with the
requirements specified in subsection 2 of section 33.1-24-02-209.
8.
The remanufacturer or other person that stores or treats the hazardous secondary material
who controls air pollutant emissions by using a pressure tank shall meet the following
requirements.
a.
The tank must be designed not to vent to the atmosphere as a result of compression of
the vapor headspace in the tank during filling of the tank to its design capacity.
b.
All tank openings must be equipped with closure devices designed to operate with no
detectable organic emissions as determined using the procedure specified in
subsection 4 of section 33.1-24-02-203.
c.
Whenever a hazardous secondary material is in the tank, the tank must be operated as a
closed system that does not vent to the atmosphere except under either of the following
conditions as specified in paragraph 1 or 2:
(1)
At those times when opening of a safety device, as defined in section
33.1-24-02-201, is required to avoid an unsafe condition.
(2)
At those times when purging of inerts from the tank is required and the purge
stream is routed to a closed-vent system and control device designed and operated
in accordance with the requirements of section 33.1-24-02-207.
9.
The remanufacturer or other person that stores or treats the hazardous secondary material
who controls air pollutant emissions by using an enclosure vented through a closed-vent
system to an enclosed combustion control device shall meet the requirements specified in
subdivisions a through d.
a.
The tank must be located inside an enclosure. The enclosure must be designed and
operated in accordance with the criteria for a permanent total enclosure as specified in
"Procedure T - Criteria for and Verification of a Permanent or Temporary Total Enclosure"
under 40 CFR 52.741, appendix B. The enclosure may have permanent or temporary
openings to allow worker access; passage of material into or out of the enclosure by
conveyor, vehicles, or other mechanical means; entry of permanent mechanical or
electrical equipment; or direct airflow into the enclosure. The remanufacturer or other
person that stores or treats the hazardous secondary material shall perform the
verification procedure for the enclosure as specified in Section 5.0 to "Procedure T -
Criteria for and Verification of a Permanent or Temporary Total Enclosure" initially when
the enclosure is first installed and, thereafter, annually.
b.
The enclosure must be vented through a closed-vent system to an enclosed combustion
control device that is designed and operated in accordance with the standards for either
a vapor incinerator, boiler, or process heater specified in section 33.1-24-02-207.
c.
Safety devices, as defined in section 33.1-24-02-201, may be installed and operated as
necessary on any enclosure, closed-vent system, or control device used to comply with
the requirements of subdivisions a and b.
d.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall inspect and monitor the closed-vent system and control device as specified
in section 33.1-24-02-207.
10.
The remanufacturer or other person that stores or treats the hazardous secondary material
shall transfer hazardous secondary material to a tank subject to this section in accordance
with the following requirements:
a.
Transfer of hazardous secondary material, except as provided in subdivision b, to the
tank from another tank subject to this section must be conducted using continuous
hard-piping or another closed system that does not allow exposure of the hazardous
secondary material to the atmosphere. For the purpose of complying with this provision,
an individual drain system is considered to be a closed system when it meets the
requirements of 40 CFR part 63, subpart RR - National Emission Standards for Individual
Drain Systems.
b.
The requirements of subdivision a do not apply when transferring a hazardous secondary
material to the tank under any of the following conditions:
(1)
The hazardous secondary material meets the average VO concentration conditions
specified in subdivision a of subsection 3 of section 33.1-24-02-202 at the point of
material origination.
(2)
The hazardous secondary material has been treated by an organic destruction or
removal process to meet the requirements in subdivision b of subsection 3 of
section 33.1-24-02-202.
(3)
The hazardous secondary material meets the requirements of subdivision d of
subsection 3 of section 33.1-24-02-202.
11.
The remanufacturer or other person that stores or treats the hazardous secondary material
shall repair each defect detected during an inspection performed in accordance with the
requirements of subdivision d of subsection 3, subdivision c of subsection 5, subdivision c of
subsection 6, or subdivision c of subsection 7 as follows:
a.
The remanufacturer or other person that stores or treats the hazardous secondary
material shall make first efforts at repair of the defect no later than five calendar days
after detection, and repair shall be completed as soon as possible but no later than
forty-five calendar days after detection except as provided in subdivision b.
b.
Repair of a defect may be delayed beyond forty-five calendar days if the remanufacturer
or other person that stores or treats the hazardous secondary material determines that
repair of the defect requires emptying or temporary removal from service of the tank and
no alternative tank capacity is available at the site to accept the hazardous secondary
material normally managed in the tank. In this case, the remanufacturer or other person
that stores or treats the hazardous secondary material shall repair the defect the next
time the process or unit that is generating the hazardous secondary material managed in
the tank stops operation. Repair of the defect must be completed before the process or
unit resumes operation.
12.
Following the initial inspection and monitoring of the cover as required by the applicable
provisions of sections 33.1-24-02-200 through 33.1-24-02-214, subsequent inspection and
monitoring may be performed at intervals longer than one year under the following special
conditions:
a.
In the case when inspecting or monitoring the cover would expose a worker to
dangerous, hazardous, or other unsafe conditions, the remanufacturer or other person
that stores or treats the hazardous secondary material may designate a cover as an
"unsafe to inspect and monitor cover" and comply with all of the following requirements:
(1)
Prepare a written explanation for the cover stating the reasons why the cover is
unsafe to visually inspect or to monitor, if required.
(2)
Develop and implement a written plan and schedule to inspect and monitor the
cover, using the procedures specified in the applicable section of sections
33.1-24-02-200 through 33.1-24-02-214, as frequently as practicable during those
times when a worker can safely access the cover.
b.
In the case when a tank is buried partially or entirely underground, a remanufacturer or
other person that stores or treats the hazardous secondary material is required to inspect
and monitor, as required by the applicable provisions of this section, only those portions
of the tank cover and those connections to the tank (for example, fill ports, access
hatches, gauge wells) which are located on or above the ground surface.