NDAC 33.1-24-05-120
Monitoring and inspection
Cite as N.D. Admin. Code ยง 33.1-24-05-120
1.
During construction and installation, liners (except in the case of existing portions of surface
impoundments exempt from subsection 1 of section 33.1-24-05-119) and cover systems (for
example, membranes, sheets, or coatings) must be inspected for uniformity, damage, and
imperfections (for example, holes, cracks, thin spots, or foreign materials). Immediately after
construction or installation:
a.
Synthetic liners and covers must be inspected to ensure tight seams and joints and the
absence of tears, punctures, or blisters; and
b.
Soil-based and admixed liners and covers must be inspected for imperfections, including
lenses, cracks, channels, root holes, or other structural nonuniformities that may cause
an increase in the permeability of the liner or cover.
These inspections must be conducted by a qualified professional (for example, registered
professional engineer).
2.
While a surface impoundment is in operation, it must be inspected weekly and after storms to
detect evidence of any of the following:
a.
Deterioration, malfunctions, or improper operation of overtopping control systems;
b.
Sudden drops in the level of the impoundments contents;
c.
The presence of liquids in leak detection systems; and
d.
Severe erosion or other signs of deterioration in dikes or other containment devices.
3.
Prior to the issuance of a permit, and after any period of time greater than six months during
which the impoundment was not in service, the owner or operator shall obtain a certification
from a qualified engineer that the impoundment's dike, including that portion of any dike which
provides freeboard, has structural integrity. The certification must establish, in particular, that
the dike:
a.
Will withstand the stress of the pressure exerted by the types and amounts of waste to
be placed in the impoundment; and
b.
Will not fail due to scouring or piping, without dependence on any liner system included
in the surface impoundment construction.
4.
An owner or operator required to have a leak detection system shall comply with the following:
a.
An owner or operator required to have a leak detection system under subsection 3 or 4 of
section 33.1-24-05-119 must record the amount of liquids removed from each leak
detection system sump at least once each week during the active life and closure period.
b.
After the final cover is installed, the amount of liquids removed from each leak detection
system sump must be recorded at least monthly. If the liquid level in the sump stays
below the pump operating level for two consecutive months, the amount of liquids in the
sumps must be recorded at least quarterly. If the liquid level in the sump stays below the
pump operating level for two consecutive quarters, the amount of liquids in the sumps
must be recorded at least semiannually. If at any time during the postclosure care period
the pump operating level is exceeded at units on quarterly or semiannual recording
schedules, the owner or operator must return to monthly recording of amounts of liquids
removed from each sump until the liquid level again stays below the pump operating
level for two consecutive months.
c.
"Pump operating level" is a liquid level proposed by the owner or operator and approved
by the department based on pump activation level, sump dimensions, and level that
avoids backup into the drainage layer and minimizes head in the sump.