NDAC 33.1-24-05-57
Corrective action program
Cite as N.D. Admin. Code ยง 33.1-24-05-57
An owner or operator required to establish a corrective action program under sections
33.1-24-05-47 through 33.1-24-05-58 shall, at a minimum, discharge the following responsibilities:
1.
The owner or operator shall take corrective action to ensure that regulated units are in
compliance with the ground water protection standard under section 33.1-24-05-49. The
department will specify the ground water protection standard in the facility permit including:
a.
A list of the hazardous constituents identified under section 33.1-24-05-50.
b.
Concentration limits under section 33.1-24-05-51 for each of those hazardous
constituents.
c.
The compliance point under section 33.1-24-05-52.
d.
The compliance period under section 33.1-24-05-53.
2.
The owner or operator shall implement a corrective action program that prevents hazardous
constituents from exceeding their respective concentration limits at the compliance point by
removing the hazardous waste constituents or treating them in place. The permit will specify
the specific measures that will be taken.
3.
The owner or operator shall begin corrective action within a reasonable time period after the
ground water protection standard is exceeded. The department will specify that time period in
the facility permit. If a facility permit includes a corrective action program in addition to a
compliance monitoring program, the permit will specify when the corrective action will begin
and such a requirement will operate in lieu of subdivision b of subsection 9 of section
33.1-24-05-56.
4.
In conjunction with a corrective action program, the owner or operator shall establish and
implement a ground water monitoring program to demonstrate the effectiveness of the
corrective action program. Such a monitoring program may be based on the requirements for
a compliance monitoring program under section 33.1-24-05-56 and must be as effective as
that program in determining compliance with the ground water protection standard under
section 33.1-24-05-49 and in determining the success of a corrective action program under
subsection 5 where appropriate.
5.
In addition to the other requirements of this section, the owner or operator shall conduct a
corrective action program to remove or treat in place any hazardous constituents under
section 33.1-24-05-50 that exceed concentration limits under section 33.1-24-05-51 in ground
water:
a.
Between the compliance point under section 33.1-24-05-52 and the downgradient
property boundary; and
b.
Beyond the facility boundary, where necessary to protect human health and the
environment, unless the owner or operator demonstrates to the satisfaction of the
department that, despite the owner's or operator's best efforts, the owner or operator was
unable to obtain the necessary permission to undertake such action. The owner or
operator is not relieved of all responsibility to clean up a release that has migrated
beyond the facility boundary where offsite access is denied. Onsite measures to address
such releases will be determined on a case-by-case basis.
c.
Corrective action measures under this subsection must be initiated and completed within
a reasonable period of time considering the extent of contamination.
d.
Corrective action measures under this subsection may be terminated once the
concentration of hazardous constituents under section 33.1-24-05-50 is reduced to levels
below their respective concentration limits under section 33.1-24-05-51.
6.
The owner or operator shall continue corrective action measures during the compliance period
to the extent necessary to ensure that the ground water protection standard is not exceeded.
If the owner or operator is conducting corrective action at the end of the compliance period,
the owner or operator shall continue that corrective action for as long as necessary to achieve
compliance with the ground water protection standard. The owner or operator may terminate
corrective action measures taken beyond the period equal to the active life of the waste
management area (including the closure period) if the owner or operator can demonstrate,
based on data from the ground water monitoring program under subsection 4, that the ground
water protection standard of section 33.1-24-05-49 has not been exceeded for a period of
three consecutive years.
7.
The owner or operator shall report in writing to the department on the effectiveness of the
corrective action program. The owner or operator shall submit these reports annually.
8.
If the owner or operator determines that the corrective action program no longer satisfies the
requirements of this section, the owner or operator shall, within ninety days, submit an
application for a permit modification to make any appropriate changes to the program.