NDAC 33.1-24-06-100
Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel
Cite as N.D. Admin. Code ยง 33.1-24-06-100
boilers, liquid fuel boilers, and hydrochloric acid production furnaces to minimize emissions
from startup, shutdown, and malfunction events.
1.
Facilities with existing permits.
a.
Revisions to permit conditions after documenting compliance with maximum achievable
control technology. The owner or operator of a hazardous waste permitted incinerator,
cement kiln, lightweight aggregate kiln, solid fuel boiler, liquid fuel boiler, or hydrochloric
acid production furnace may request that the department address permit conditions that
minimize emissions from startup, shutdown, and malfunction events under any of the
following options when requesting removal of permit conditions that are no longer
applicable according to subsection 2 of section 33.1-24-05-144 and subsection 2 of
section 33.1-24-05-525:
(1)
Retain relevant permit conditions. Under this option, the department will:
(a)
Retain permit conditions that address releases during startup, shutdown, and
malfunction events, including releases from emergency safety vents, as these
events are defined in the facility's startup, shutdown, and malfunction plan
required under 40 CFR 63.1206(c)(2); and
(b)
Limit applicability of those permit conditions only to when the facility is
operating under the facility's startup, shutdown, and malfunction plan.
(2)
Revise relevant permit conditions.
(a)
Under this option, the department will:
[1]
Identify a subset of relevant existing permit requirements, or develop
alternative permit requirements, that ensure emissions of toxic
compounds are minimized from startup, shutdown, and malfunction
events, including releases from emergency safety vents, based on review
of information, including the source's startup, shutdown, and malfunction
plan, design, and operating history.
[2]
Retain or add these permit requirements to the permit to apply only when
the facility is operating under the facility's startup, shutdown, and
malfunction plan.
(b)
Changes that may significantly increase emissions.
[1]
The permittee must notify the department in writing of changes to the
startup, shutdown, and malfunction plan or changes to the design of the
source that may significantly increase emissions of toxic compounds from
startup, shutdown, or malfunction events, including releases from
emergency safety vents. The permittee must notify the department of
such changes within five days of making such changes. The permittee
must identify in the notification recommended revisions to permit
conditions necessary as a result of the changes to ensure that emissions
of toxic compounds are minimized during these events.
[2]
The department may revise permit conditions as a result of these
changes to ensure that emissions of toxic compounds are minimized
during startup, shutdown, or malfunction events, including releases from
emergency safety vents either:
[a]
Upon permit renewal, or, if warranted;
[b]
By modifying the permit under subsection 1 of section 33.1-24-06-12
or section 33.1-24-06-14.
[c]
Remove permit conditions. Under this option:
The owner or operator must document that the startup, shutdown,
and malfunction plan required under 40 CFR 63.1206(c)(2) has been
approved by the department under 40 CFR 63.1206(c)(2)(ii)(B); and
The department will remove permit conditions that are no longer
applicable according to subsection 2 of section 33.1-24-05-144 and
subsection 2 of section 33.1-24-05-525.
b.
Addressing permit conditions upon permit reissuance. The owner or operator of an
incinerator, cement kiln, lightweight aggregate kiln, solid fuel boiler, liquid fuel boiler, or
hydrochloric acid production furnace that has conducted a comprehensive performance
test and submitted to the department a notification of compliance documenting
compliance with the standards of 40 CFR part 63, subpart EEE, may request in the
application to reissue the permit for the combustion unit that the department control
emissions from startup, shutdown, and malfunction events under any of the following
options:
(1)
Hazardous waste option A. Under this option, the department will:
(a)
Include, in the permit, conditions that ensure compliance with subsections 1
and 3 of section 33.1-24-05-149 or subdivision a of subsection 5 of section
33.1-24-05-527 and paragraph 3 of subdivision b of subsection 5 of section
33.1-24-05-527 to minimize emissions of toxic compounds from startup,
shutdown, and malfunction events, including releases from emergency safety
vents; and
(b)
Specify that these permit requirements apply only when the facility is operating
under the facility's startup, shutdown, and malfunction plan; or
(2)
Hazardous waste option B.
(a)
Under this option, the department will:
[1]
Include in the permit conditions that ensure emissions of toxic compounds
are minimized from startup, shutdown, and malfunction events, including
releases from emergency safety vents, based on review of information,
including the source's startup, shutdown, and malfunction plan, design,
and operating history; and
[2]
Specify that these permit requirements apply only when the facility is
operating under the facility's startup, shutdown, and malfunction plan.
(b)
Changes that may significantly increase emissions.
[1]
The permittee must notify the department in writing of changes to the
startup, shutdown, and malfunction plan or changes to the design of the
source that may significantly increase emissions of toxic compounds from
startup, shutdown, or malfunction events, including releases from
emergency safety vents. The permittee must notify the department of
such changes within five days of making such changes. The permittee
must identify in the notification recommended revisions to permit
conditions necessary as a result of the changes to ensure that emissions
of toxic compounds are minimized during these events.
[2]
The department may revise permit conditions as a result of these
changes to ensure that emissions of toxic compounds are minimized
during startup, shutdown, or malfunction events, including releases from
emergency safety vents either:
[a]
Upon permit renewal, or, if warranted;
[b]
By modifying the permit under subsection 1 of section 33.1-24-06-12
or section 33.1-24-06-14; or
[c]
Clean Air Act option. Under this option:
The owner or operator must document that the startup, shutdown,
and malfunction plan required under 40 CFR 63.1206(c)(2) has been
approved by the department under 40 CFR 63.1206(c)(2)(ii)(B); and
The department will omit from the permit conditions that are not
applicable under subsection 2 of section 33.1-24-05-144 and
subsection 2 of section 33.1-24-05-525.
2.
Interim status facilities.
a.
Interim status operations. In compliance with subsection 5 of section 33.1-24-06-16 and
subsection 2 of section 33.1-24-05-525, the owner or operator of an incinerator, cement
kiln, lightweight aggregate kiln, solid fuel boiler, liquid fuel boiler, or hydrochloric acid
production furnace that is operating under the interim status standards of subsection 5 of
section 33.1-24-06-16 or sections 33.1-24-05-191 through 33.1-24-05-249,
33.1-24-05-525 through 33.1-24-05-549, and 33.1-24-05-820 through 33.1-24-05-929
may control emissions of toxic compounds during startup, shutdown, and malfunction
events under either of the following options after conducting a comprehensive
performance test and submitting to the department a notification of compliance
documenting compliance with the standards of 40 CFR part 63, subpart EEE:
(1)
Hazardous waste option. Under this option, the owner or operator continues to
comply with the interim status emission standards and operating requirements of
subsection 5 of section 33.1-24-06-16 or sections 33.1-24-05-191 through
33.1-24-05-249, 33.1-24-05-525 through 33.1-24-05-549, and 33.1-24-05-820
through 33.1-24-05-929 relevant to control of emissions from startup, shutdown, and
malfunction events. Those standards and requirements apply only during startup,
shutdown, and malfunction events; or
(2)
Clean Air Act option. Under this option, the owner or operator is exempt from the
interim status standards of subsection 5 of section 33.1-24-06-16 or sections
33.1-24-05-191 through 33.1-24-05-249, 33.1-24-05-525 through 33.1-24-05-549,
and 33.1-24-05-820 through 33.1-24-05-929 relevant to control of emissions of toxic
compounds during startup, shutdown, and malfunction events upon submission of
written notification and documentation to the department that the startup, shutdown,
and malfunction plan required under 40 CFR 63.1206(c)(2) has been approved by
the department under 40 CFR 63.1206(c)(2)(ii)(B).
b.
Operations under a subsequent hazardous waste permit. When an owner or operator of
an incinerator, cement kiln, lightweight aggregate kiln, solid fuel boiler, liquid fuel boiler,
or hydrochloric acid production furnace that is operating under the interim status
standards of subsection 5 of section 33.1-24-06-16 or sections 33.1-24-05-191 through
33.1-24-05-249, 33.1-24-05-525 through 33.1-24-05-549, and 33.1-24-05-820 through
33.1-24-05-949 submits a hazardous waste permit application, the owner or operator
may request that the department control emissions from startup, shutdown, and
malfunction events under any of the options provided by subitems a, b, or c of item 2 of
subparagraph b of paragraph 2 of subdivision b of subsection 1.
3.
New units. Hazardous waste incinerator, cement kiln, light weight aggregate kiln, solid fuel
boiler, liquid fuel boiler, or hydrochloric acid production furnace units that become subject to
hazardous waste permit requirements after October 12, 2005, must control emissions of toxic
compounds during startup, shutdown, and malfunction events, under either of the following
options:
a.
Comply with the requirements specified in 40 CFR 63.1206(c)(2); or
b.
Request to include in the hazardous waste permit, conditions that ensure emissions of
toxic compounds are minimized from startup, shutdown, and malfunction events,
including releases from emergency safety vents, based on review of information
including the source's startup, shutdown, and malfunction plan and design. The
department will specify that these permit conditions apply only when the facility is
operating under the facility's startup, shutdown, and malfunction plan.