NDAC 33.1-24-08-56
Corrective action plan
Cite as N.D. Admin. Code ยง 33.1-24-08-56
1.
At any point after reviewing the information submitted in compliance with sections
33.1-24-08-51 through 33.1-24-08-53, the department may require owners and operators to
submit additional information or to develop and submit a corrective action plan for responding
to contaminated soils and ground water. If a plan is required, owners and operators must
submit the plan according to a schedule and format established by the department.
Alternatively, owners and operators may, after fulfilling the requirements of sections
33.1-24-08-51 through 33.1-24-08-53, choose to submit a corrective action plan for
responding to contaminated soil and ground water. In either case, owners and operators are
responsible for submitting a plan that provides for adequate protection of human health and
the environment as determined by the department, and must modify their plan as necessary to
meet this standard.
2.
The department will approve the corrective action plan only after ensuring that implementation
of the plan will adequately protect human health, safety, and the environment. In making this
determination, the department should consider the following factors as appropriate:
a.
The physical and chemical characteristics of the regulated substance, including its
toxicity, persistence, and potential for migration;
b.
The hydrogeologic characteristics of the facility and the surrounding area;
c.
The proximity, quality, and current and future uses of nearby surface water and ground
water;
d.
The potential effects of residual contamination on nearby surface water and ground
water;
e.
An exposure assessment; and
f.
Any information assembled in compliance with sections 33.1-24-08-50 through
33.1-24-08-57.
3.
Upon approval of the corrective action plan or as directed by the department, owners and
operators must implement the plan, including modifications to the plan made by the
department. They must monitor, evaluate, and report the results of implementing the plan in
accordance with a schedule and in a format established by the department.
4.
Owners and operators may, in the interest of minimizing environmental contamination and
promoting more effective cleanup, begin cleanup of soil and ground water before the
corrective action plan is approved provided they:
a.
Notify the department of their intention to begin cleanup;
b.
Comply with any conditions imposed by the department, including halting cleanup or
mitigating adverse consequences from cleanup activities; and
c.
Incorporate these self-initiated cleanup measures in the corrective action plan that is
submitted to the department for approval.