NDAC 33.1-25-01-12
Plugging and abandonment
Cite as N.D. Admin. Code ยง 33.1-25-01-12
1.
Any class I permit shall include, and any class V permit may include, a plan for plugging and
abandonment which shall be incorporated into the permit as a condition to ensure that
movement of fluids either into an underground source of drinking water or between
underground sources of drinking water is not allowed.
2.
After a cessation of operations of two years the owner or operator shall plug and abandon the
well in accordance with the plan unless the owner or operator:
a.
Provides notice to the director; and
b.
Describes actions or procedures, satisfactory to the director, that the owner or operator
will take to ensure that the well will not endanger underground sources of drinking water
during the period of temporary abandonment. These actions and procedures shall
include compliance with the technical requirements applicable to active injection wells
unless waived by the director.
3.
The permittee shall notify the director at such times as the permit requires before conversion
or abandonment of the well or in the case of area permits before closure of the project.
Owners and operators of class V wells authorized by section 33.1-25-01-16 must notify the
director at least thirty days prior to closure.
4.
Prior to granting approval for plugging and abandonment of a class I well, the director shall
consider the plan submitted by the operator which contains the information listed under
title 40 CFR part 146, section 146.14(c) (for nonhazardous waste injection wells) or
title 40 CFR part 146, sections 146.71(a)(4) and 146.72(a) (for hazardous waste injection
wells).