NDAC 43-02-02.1-14

Mechanical integrity

Last amended: 1984Year: 2026Length: 41 wordsOfficial source

Cite as N.D. Admin. Code ยง 43-02-02.1-14

A permit for any Class III well or injection project which lacks mechanical integrity must include a condition prohibiting injection operations until the state geologist is satisfied that the specifications for mechanical integrity listed in 40 CFR 146.08 have been met.
NDAC 43-02-02.1-14: Mechanical integrity | Justis AI