NDAC 43-02-02.3-23
Performance and reclamation standards and requirements
Cite as N.D. Admin. Code ยง 43-02-02.3-23
The land surface of the permit area will be restored as nearly as possible to its original condition
unless conflicting with the approved postmining land use. Each reclamation plan must be developed to
meet the site-specific characteristics of the mining operation and the site.
1.
Most appropriate technology and best management practices. The mining operation and the
reclamation plan shall be designed and operated using the most appropriate technology and
the best management practices.
2.
Contemporaneous reclamation. Contemporaneous reclamation is required to the maximum
extent practicable and in a manner that is consistent with the approved reclamation plan. All
reclamation work must be completed within three years of completion of mining.
3.
Assure protection. The mining operation and completed reclamation shall meet the following
requirements established to assure protection of human health and safety, the environment,
wildlife, and domestic animals.
a.
Signs, markers and safeguarding. Measures will be taken to safeguard the public to
prevent falls from highwalls or pit edges. Depending on site-specific characteristics, the
following measures shall be required:
(1)
Posting warning signs in locations near hazardous areas;
(2)
Restricting access to hazardous areas;
(3)
Marking the permit area boundaries;
(4)
Posting a sign at the main entrances giving a telephone number of a person to call
in the event of emergencies related to the mine; or
(5)
Other measures as needed to protect human safety.
b.
Wildlife protection. Measures shall be taken to minimize adverse impacts on wildlife and
important habitat. Based on site-specific characteristics, the following measures will be
required:
(1)
Restricting access of wildlife and domestic animals to toxic chemicals or otherwise
harmful materials;
(2)
Minimizing harm to wildlife habitat during mining; and
(3)
Reclaiming areas of wildlife habitat if not in conflict with the approved postmining
land use.
c.
Cultural resources. Cultural resources listed on or eligible for listing on the national
register of historic places, and any cemeteries or burial grounds shall be protected until
clearance has been granted by the appropriate authority.
d.
Hydrologic balance. Operations shall be planned and conducted to minimize change to
the hydrologic balance in both the permit and potentially affected areas. If not in conflict
with the approved postmining land use, reclamation shall result in a hydrologic balance
similar to premining conditions unless nonmining impacts have substantially changed the
hydrologic balance.
(1)
Operations shall be designed so that nonpoint source surface releases of acid or
other toxic substances shall be contained within the permit area, and that all other
surface flows from the disturbed area are treated to meet all applicable state and
federal regulations.
(2)
The disturbed areas shall not contribute suspended solids above background levels,
or where applicable the state department of health standards, to ephemeral,
intermittent, and perennial streams.
(3)
To provide data to determine background levels for surface water entering the
permit area, appropriate monitoring shall be conducted on drainages leading into
the permit area.
(4)
All diversions of overland flow shall be designed, constructed, and maintained to
minimize adverse impacts to the hydrologic balance and to assure the safety of the
public.
(a)
No diversion shall be located so as to increase the potential for landslides.
(b)
Unless site-specific characteristics require a different standard which is
included in the approved permit, diversions which have watersheds larger than
ten acres shall be designed, constructed, and maintained to safely pass the
peak runoff from a ten-year, twenty-four-hour precipitation event.
(c)
All diversion designs which have watersheds larger than ten acres shall be
included in the permit application and certified by a registered professional
engineer. Diversion designs shall be kept onsite or otherwise be made
available, upon request, to the director for inspection.
(d)
When no longer needed, temporary diversions shall be removed and the
disturbed area reclaimed.
e.
Stream diversions. When streams are to be diverted, the stream channel diversion shall
be designed, constructed, and removed in accordance with the following:
(1)
Unless site-specific characteristics require different measures to meet the
performance standard and are included in the approved permit, the combination of
channel, bank and floodplain configurations shall be adequate to safely pass the
peak runoff of a ten-year, twenty-hour-hour precipitation event for temporary
diversions, and a hundred-year, twenty-four-hour precipitation event for permanent
diversions;
(2)
The design and construction of all intermittent and perennial stream channel
diversions shall be certified by a registered professional engineer. As-built drawings
shall be completed promptly after construction and be included in the permit
application and retained onsite or otherwise made available upon request to the
director; and
(3)
When no longer needed, temporary stream channel diversions shall be removed
and the disturbed area reclaimed.
f.
Impoundments. If impoundments are required, they shall be designed, constructed, and
maintained to minimize adverse impacts to the hydrologic balance and adjoining property
and to assure the safety of the public.
(1)
Unless site-specific characteristics require different measures to meet the
performance standard and are included in the approved permit, impoundments
having earthen embankments but not subject to the jurisdiction of the mine safety
and health administration or the state department of health shall:
(a)
Have a minimum elevation at the top of the settled embankment of two feet
above the water surface in the pond with the spillway flowing at the design
depth;
(b)
Have a top width of the embankment not less than six feet;
(c)
Have combined upstream and downstream side slopes of the settled
embankment not less than five horizontal: one vertical with neither slope
steeper than two horizontal: one vertical. Slopes shall be vegetated or
otherwise stabilized to control erosion;
(d)
Have the embankment foundation cleared of all vegetative matter, all surfaces
sloped to no steeper than one horizontal: one vertical and the entire foundation
area scarified;
(e)
Have fill material free of vegetative matter and frozen soil;
(f)
Have sufficient capacity for sediment storage and have sediment removed
when that capacity is reached; and
(g)
Have spillways provided to safely discharge the peak runoff of a
twenty-five-year, twenty-four-hour precipitation event, or an event with a ninety
percent change of not being exceeded for the design life of the structure; or
(h)
Have other site-specific design criteria for embankments as long as they result
in a minimum static safety factor for 1.3 with water impounded to the design
level;
(i)
Be designed and certified by a registered professional engineer. As-built
drawings shall be completed promptly after construction and be retained onsite
or otherwise made available upon request to the director; and
(j)
If necessary for sediment control, be in place before any other disturbance to
the watershed for the impoundment.
(2)
When no longer required, impoundments shall be graded to achieve positive
drainage unless:
(a)
The surface estate owner has requested in writing that they be retained;
(b)
They are consistent with the approved reclamation plan; and
(c)
They are appropriate for the postmining land use for the self-sustaining
ecosystem.
g.
Minimization of mass movement. All temporary stockpiles shall be constructed and
maintained to minimize mass movement.
h.
Riparian and wetland areas. Disturbance to riparian and wetland areas shall be
minimized during mining. Adverse effects to riparian and wetland areas shall be mitigated
during reclamation unless the mitigation conflicts with the approved postmining land use.
i.
Roads. Roads shall be constructed and maintained to control erosion.
(1)
Drainage control structures shall be used as necessary to control runoff and to
minimize erosion, sedimentation, and flooding. Culverts or other drainage facilities
shall be installed as road construction progresses and shall be capable of safely
passing a ten-year, twenty-four-hour precipitation event unless site-specific
characteristics indicate a different standard is appropriate and is included in the
approved permit. Culverts and drainage pipes shall be constructed and maintained
to avoid plugging, collapsing, or erosion.
(2)
Roads to be constructed in or across intermittent or perennial streams require
site-specific designs to be submitted with the permit application.
(3)
Permanent roads must be approved by the surface owner and be consistent with
the approved postmining land use.
j.
Explosives. Blasting shall be conducted to prevent injury to persons or damage to
property not owned by the operator. Fly rock shall be confined to the permit area. The
director may require a detailed blasting plan, preblast surveys or specify blast design
limits to control possible adverse effects to structures.
4.
Reclamation of surface facilities. The permit area shall be stabilized, to the extent practicable,
to minimize future impact to the environment and protect air and water resources. Unless
otherwise approved by the department, the reclamation of surface facilities shall include the
removal of all buildings, road, and structures, and the surface restored as nearly as possible
to its original condition. Tailings impoundments and ponds must be reclaimed and filled in and
respread with topsoil and subsoil. All grading, backfilling, and topographic reconstruction must
control erosion and sedimentation, protect areas outside the affected land from slides or other
damage, and minimize the need for long-term maintenance.
Measures must be taken to reduce, to the extent practicable, the formation of acid and other
toxic drainage that may otherwise occur following closure to prevent releases that cause
federal or state standards to be exceeded. Nonpoint source surface releases for acid or other
toxic substances shall be contained within the permit area.
Pond and impoundment reclamation must meet the following requirements:
a.
Pond sludge must be chemically characterized to determine whether further treatment is
necessary before disposal. Sludge must be removed for disposal at on offsite permitted
solid waste facility or buried and covered onsite in a solid waste facility permitted in
accordance with the applicable solid waste rules in North Dakota Administrative Code
article 33-20; and
b.
Geomembranes must be removed from impoundments, unless it is demonstrated to the
department's satisfaction that they will serve a useful function consistent with the
approved postmining land use. The geomembrane material must be disposed of in a
permitted landfill or may be disposed of onsite only if the operator first secures a solid
waste permit in compliance with article 30-20.
5.
Topsoil and subsoil. The operator shall take measures to remove and save all available topsoil
and subsoil and protect it from erosion or contamination and assure that it is in a usable
condition for sustaining vegetation when needed The following requirements shall be met
unless site-specific characteristics mandate different requirements and those requirements are
included in the approved permit.
a.
Topsoil and subsoil shall be sampled and analyzed for vegetation establishment
suitability:
(1)
Sample spacing and interval shall be based on site-specific materials; and
(2)
Suitability will be identified by analysis based on site-specific materials.
b.
Revegetation must be a component of the reclamation plan and all available topsoil and
subsoil must be salvaged and replaced on disturbed areas.
c.
Where direct distribution of topsoil and subsoil is not possible, it shall be stockpiled
separately and in a manner to prevent loss of the resource.
d.
Topsoil and subsoil shall be distributed in a manner to establish and maintain vegetation,
consistent with the approved permit.
e.
After distribution, topsoiled and subsoiled areas shall be stabilized to protect loss of the
resource.
f.
Where topsoil has been stockpiled for more than one year, the operator may be required
to conduct analyses to determine if amendments are necessary.
6.
Erosion control. Reclamation of disturbed lands must result in a condition that minimizes
erosion. Revegetated lands must not contribute suspended solids above background levels,
or where applicable, the state department of health standards, to streamflow of intermittent
and perennial streams. Acceptable practices to control erosion include the following:
a.
Stabilizing disturbed areas through land shaping, berming, or grading to final contour;
b.
Minimizing reconstructed slope lengths and gradients;
c.
Diverting runoff;
d.
Establishing vegetation;
e.
Regulating channel velocity of water;
f.
Lining drainage channels with rock, vegetation, or other geotechnical materials; and
g.
Mulching.
7.
Revegetation. Revegetated lands must meet the following standards:
a.
Revegetation success for a return as near as possible to original condition shall be
determined through comparison of ground cover, productivity, and diversity and shall be
made on the basis of the following approved reference areas:
(1)
Foliage or basal cover and productivity of living perennial plants of the revegetated
area shall be established equal to ninety percent of the reference area or equal to
the approved revegetation standard using scientifically valid sampling techniques;
(2)
Diversity of plant life forms (woody plants, grasses, forbs) shall consider what is
reasonable based on the physical environment of the reclaimed area; and
(3)
Woody plant species shall be established to the approved density standard.
b.
For areas for which the approved postmining land use is for wildlife habitat or forest land,
success of vegetation shall be determined on the basis of tree or shrub stocking (density)
and ground cover.
(1)
The ground cover of living perennial plants shall be equal to ninety percent of the
native ground cover of the reference area or other approved standard and shall be
adequate to minimize erosion.
(2)
Tree density for forest land shall have establishment rates of plant species equal to
ninety percent of the approved reference area or other approved standard and shall
be adequate to minimize erosion.
(3)
If wildlife habitat is to be the postmining land use, the operator shall select and use
plant species on the reclaimed areas based on the following criteria:
(a)
Their proven nutritional value for fish and wildlife;
(b)
Their uses as cover and security for wildlife;
(c)
Their ability to support and enhance fish and wildlife habitat; and
(d)
Distribution of plant life forms to maximize benefits of edge effect, cover, and
other benefits for fish and wildlife.
c.
Revegetation for other postmining land shall be consistent with the approved postmining
land use. Site-specific standards may include standards for foliar or basal cover,
production, and diversity and will be included in the approved permit.