NDAC 43-02-02.4-21
Notice of mechanical integrity testing
Cite as N.D. Admin. Code ยง 43-02-02.4-21
At least thirty days before a regularly scheduled test, an operator shall notify the director of the date
and approximate time of the test. The notification shall include a copy of the proposed test procedure,
including procedures for wireline logging. Mechanical integrity testing shall not be conducted until an
operator has received approval of the test procedure from the director. Mechanical integrity testing may
be witnessed by the director.