NDAC 43-02-02.4-24
Reports of mechanical integrity. The operator shall file a signed copy of the report of a mechanical integrity test with the director
Cite as N.D. Admin. Code ยง 43-02-02.4-24
within sixty days after testing. A copy of the pressure record shall accompany the report. The report
shall include evaluation of the test results by a person qualified to provide such an evaluation. Reports
of mechanical integrity demonstrations utilizing downhole logs shall be accompanied by an
interpretation of the log by a person qualified to make such interpretations.