NDAC 43-02-02.4-26
Cavity size
Cite as N.D. Admin. Code ยง 43-02-02.4-26
The operator of a solution well shall submit a plan to monitor cavity size and shape for approval by
the director. The plan shall include frequency of monitoring and shall include a description of the
method used to determine the size and shape of the cavity.