NDAC 43-02-02.4-26

Cavity size

Last amended: 2013Year: 2026Length: 46 wordsOfficial source

Cite as N.D. Admin. Code ยง 43-02-02.4-26

The operator of a solution well shall submit a plan to monitor cavity size and shape for approval by the director. The plan shall include frequency of monitoring and shall include a description of the method used to determine the size and shape of the cavity.
NDAC 43-02-02.4-26: Cavity size | Justis AI