NDAC 43-02-02.4-40
Purging, removal, and abandonment of lines and vessels
Cite as N.D. Admin. Code ยง 43-02-02.4-40
An operator of a well shall remove all flow lines and vessels, including tanks, if the flow lines or
vessels are not used for one year and shall provide notification of the removal to the director. The
director may allow a line to be purged and abandoned in place upon written application from the
operator. The director may grant an exception to this section upon written application.