NDAC 43-02-02.4-48

Rock profile determination

Last amended: 2013Year: 2026Length: 45 wordsOfficial source

Cite as N.D. Admin. Code ยง 43-02-02.4-48

The operator shall determine the cavity roof position not less than biennially. Generally accepted wireline logging methods shall be utilized. The results of the determination shall be filed with the director not more than sixty days after completion and shall include all wireline logs run.
NDAC 43-02-02.4-48: Rock profile determination | Justis AI