NDAC 43-02-02-13.2
Deviation tests and directional surveys
Cite as N.D. Admin. Code ยง 43-02-02-13.2
When any well is drilled or deepened, tests to determine the deviation from the vertical shall be
taken at least every one thousand feet [304.8 meters]. The director is authorized to waive the deviation
test for a shallow gas well if the necessity therefor can be demonstrated to the director's satisfaction.
When the deviation from the vertical exceeds five degrees at any point, the director may require that
the hole be straightened. Directional surveys may be required by the director, whenever, in the
director's judgement, the location of the bottom of the well is in doubt.
A directional survey shall be made and filed with the state geologist on any well utilizing a
whipstock or any method of deviating the well bore. The obligation to run the directional survey may be
waived by the director when a well bore is deviated to sidetrack junk in the hole, straighten a crooked
hole, control a blowout, or if the necessity therefor can be demonstrated to the director's satisfaction.
The survey contractor shall file with the state geologist free of charge one certified electronic copy of all
surveys, in a form approved by the director, within thirty days of attaining total depth. Such survey shall
be in reference to true north. The director may require the directional survey to be filed immediately
after completion if the survey is needed to conduct the operation of the director's office in a timely
manner. Special permits may be obtained from the director to drill directionally in a predetermined
direction as provided in this section.
If the director denies a request for a permit to directionally drill, the director shall advise the
applicant immediately of the reasons for the denial. The decision of the director may be appealed to the
commission.