NDAC 43-02-02-17
Casing and tubing requirements
Cite as N.D. Admin. Code § 43-02-02-17
All wells drilled for subsurface minerals below the base of the Fox Hills formation shall be
completed with strings of casing which shall be properly cemented at sufficient depths to adequately
protect and isolate all formations containing water, subsurface minerals, oil, or gas or any combination
of these; protect the pipe through salt sections encountered; and isolate the uppermost sand of the
Dakota group.
Drilling of the surface hole shall be with freshwater-based drilling mud or other method approved by
the director which will protect all freshwater-bearing strata. The surface casing shall consist of new or
reconditioned pipe that has been previously tested to one thousand pounds per square inch [6900
kilopascals]. The surface casing shall be set and cemented at a point not less than fifty feet [15.24
meters] below the base of the Fox Hills formation. Sufficient cement shall be used on surface casing to
fill the annular space behind the casing to the bottom of the cellar, if any, or to the surface of the
ground. If the annulus space is not adequately filled with cement, the director shall be notified
immediately. The operator shall diligently perform work after obtaining approval from the director. All
strings of surface casing shall stand cemented under pressure for at least twelve hours before drilling
the plug or initiating tests. The term "under pressure" as used herein shall be complied with if one float
valve is used or if pressure is otherwise held. Cementing shall be by the pump and plug method or
other methods approved by the director. The director is authorized to require an accurate gauge be
maintained on the surface casing of any well, not properly plugged and abandoned, to detect any
buildup of pressure caused by the migration of fluids.
Surface casing strings must stand under pressure until the tail cement has reached a compressive
strength of at least five hundred pounds per square inch [3450 kilopascals]. All filler cements utilized
must reach a compressive strength of at least two hundred fifty pounds per square inch [1725
kilopascals] within twenty-four hours and at least three hundred fifty pounds per square inch [2415
kilopascals] within seventy-two hours. All compressive strengths on surface casing cement shall be
calculated at a temperature of eighty degrees Fahrenheit [26.67 degrees Celsius].
Unless otherwise specified by the director, production or intermediate casing strings shall consist of
new or reconditioned pipe that has been previously tested to two thousand pounds per square inch
[13800 kilopascals]. Such strings must stand under pressure until the tail cement has reached a
compressive strength of at least five hundred pounds per square inch [3450 kilopascals]. All filler
cements utilized must reach a compressive strength of at least two hundred fifty pounds per square
inch [1725 kilopascals] within twenty-four hours and at least five hundred pounds per square inch [3450
kilopascals] within a seventy-two hours, although in any horizontal well performing a single-stage
cement job from a measured depth of greater than thirteen thousand feet [3962.4 meters], the filler
cement utilized must reach a compressive strength of at least two hundred fifty pounds per square inch
[1725 kilopascals] within forty-eight hours and at least five hundred pounds per square inch [3450
kilopascals] within ninety-six hours. All compressive strengths on production or intermediate casing
cement shall be calculated at a temperature found in the Mowry formation using a gradient of one and
two tenths degrees Fahrenheit per one hundred feet [30.48 meters] of depth plus eight degrees
Fahrenheit [26.674 degrees Celsius].
After cementing, each casing string shall be tested by application of pump pressure of at least one
thousand five hundred pounds per square inch [10350 kilopascals]. If, at the end of thirty minutes, this
pressure has dropped one hundred fifty pounds per square inch [1035 kilopascals] or more, the casing
shall be repaired after receiving approval from the director. Thereafter, the casing shall again be tested
in the same manner. Further work shall not proceed until a satisfactory test has been obtained. The
casing in a horizontal well may be tested by use of a mechanical tool set near the casing shoe after the
horizontal section has been drilled.
All flowing wells must be equipped with tubing. A tubing packer must also be utilized unless a
waiver is obtained by demonstrating the casing will not be subjected to excessive pressure or
corrosion. The packer must be set as near the producing interval as practicable, but in all cases must
be above the perforations.