NDAC 43-02-03-47
Produced water
Cite as N.D. Admin. Code ยง 43-02-03-47
Monthly water production from each well must be determined through the use of properly calibrated
meter measurements, tank measurements, or an alternate measurement method approved by the
director. This includes allocating water production back to individual wells on a monthly basis, provided
the method of volume determination and allocation procedure results in reasonably accurate production
volumes. Operators shall report monthly to the director the amount of water produced by each well on
an oil report. The reports must be filed by five p.m on the first day of the second month following that in
which production occurred.