NDAC 43-02-07.1-18
Geologic data
Cite as N.D. Admin. Code ยง 43-02-07.1-18
The following basic data collected by the operator must be delivered, free of charge, to the state
geologist within thirty days of collection:
1.
Washed and packaged sample cuts.
2.
Cores, except those portions used for necessary testing or analysis, in which case the results
of the testing, the analysis, and the description of missing portions shall be submitted to the
state geologist.
3.
Copies of all logs, including sample logs, radioactivity logs, resistivity logs, and other types of
electrical or mechanical logs.
4.
Elevation and location information on the data collection points.
5.
Other pertinent information required by the state geologist.