NDAC 43-02-12-07
Drilling and plugging requirements
Cite as N.D. Admin. Code ยง 43-02-12-07
1.
Prior to commencement of any drilling or plugging operations, the director may require a field
meeting with the geophysical contractor and subcontractors.
2.
Except in those circumstances in which the director allows otherwise, all seismic shot holes
must be plugged the same day as they were drilled and loaded. Any blown out shot holes
must be plugged as soon as reasonably practicable, unless, upon application, the director
grants an extension which may not exceed ninety days. All seismic shot holes must be
temporarily capped until final plugging.
3.
If the number of drilling rigs on a proposed project exceeds the director's capacity to provide
appropriate inspection, the director may limit the number of drilling rigs.
4.
Bentonite materials used in seismic hole plugging must be derived from naturally occurring
untreated, high swelling sodium bentonite which consists principally of the mineral
montmorillonite.
5.
A durable nonmetallic plug, designed to fit the hole, must be set at a depth of approximately
three feet [91.44 centimeters] below the surface of every shot hole.
6.
Unless the contractor can prove to the satisfaction of the commission that another method will
provide better protection to ground water and long-term land stability, seismic shot hole
plugging shall be conducted in the following manner:
a.
When water is used in conjunction with the drilling of seismic shot holes or when water is
encountered in the hole, the shot holes are to be filled with coarse ground bentonite
approximately three-fourths of one inch [19.05 millimeters] in diameter from the top of the
charge up to a depth above the final water level. Cuttings shall be added from the top of
the bentonite to the surface. Only dry cuttings shall be utilized when plugging the shot
hole. All cuttings added above the nonmetallic plug shall be tamped.
b.
When drilling with air only, and in completely dry holes, a plugging may be accomplished
by returning the cuttings to the hole. A small mound must be left over the hole for settling
allowance.
c.
Remaining cap leads must be cut off below ground level and any drilling fluid or cuttings
which are deposited on the surface around the seismic hole will be spread out in such a
manner that the growth of natural grasses or foliage will not be impaired.
d.
Any markings, including lath, pin flags, flagging, or any other debris left on the project
area, including the powder magazine, must be removed and lawfully disposed of.