Neb. Rev. Stat. § 39-2812
View Statute 39-2812
(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816 .
(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816 .
Laws 2016, LB960, § 12;
Laws 2022, LB1016, § 6.