18.60.2.13 NMAC

Oil Pipeline Tariffs

Last amended: 2006Year: 2026Length: 152 wordsOfficial source
A. An owner or operator of an oil pipeline shall file with the commission at least ten (10) days prior to its effective date two (2) copies of its tariff covering intrastate movements within New Mexico. B. An owner or operator of an oil pipeline shall file with the commission at least ten (10) days prior to its effective date two (2) copies of any changes to its tariff. C. If an owner or operator of an oil pipeline assesses separate charges for the gathering of oil and for its transportation and delivery, the charges shall be separately specified in its tariff. D. In determining whether an oil pipelineโ€™s rates for the transportation of oil are reasonable, the commission shall consider: (1) the actual costs to transport; (2) market factors; (3) the range of rates being charged by other oil pipelines for similar services; (4) any other factors the commission deems relevant.
18.60.2.13 NMAC: Oil Pipeline Tariffs | Justis AI