N.M. Stat. § 74-2-7
Permits; permit appeals to the environmental improvement
board or the local board; permit fees.
A. By regulation, the environmental improvement board or the local board shall
require:
(1)
a person intending to construct or modify any source, except as otherwise
specifically provided by regulation, to obtain a construction permit from the department
or the local agency prior to such construction or modification; and
(2)
a person intending to operate any source for which an operating permit is
required by the 1990 amendments to the federal act, except as otherwise specifically
provided by regulation, to obtain an operating permit from the department or the local
agency.
B. Regulations adopted by the environmental improvement board or the local board
shall include at least the following provisions:
(1)
requirements for the submission of relevant information, including
information the department or the local agency deems necessary to determine that
regulations and standards under the Air Quality Control Act or the federal act will not be
violated;
(2)
specification of the deadlines for processing permit applications; provided
that the deadline for a final decision by the department or the local agency on a
construction permit application may not exceed:
(a) ninety days after the application is determined to be administratively
complete, if the application is not subject to requirements for prevention of significant
deterioration, unless the secretary or the director grants an extension not to exceed
ninety days for good cause, including the need to have public hearings; or
(b) one hundred eighty days after the application is determined to be
administratively complete, if the application is subject to requirements for prevention of
significant deterioration, unless the secretary or the director grants an extension not to
exceed ninety days for good cause, including the need to have public hearings;
(3)
that if the department or local agency fails to take final action on a
construction permit application within the deadlines specified in Paragraph (2) of this
subsection, the department or local agency shall notify the applicant in writing that an
extension of time is required to process the application and specify in detail the grounds
for the extension;
(4)
a description of elements required before the department or local agency
shall deem an application administratively complete;
(5)
specification of the public notice, comment period and public hearing, if
any, required prior to the issuance of a permit; provided that the permit regulations
adopted:
(a) by the environmental improvement board shall include provisions
governing notice to nearby states; and
(b) by any local board shall include provisions requiring that notice be given to
the department of all permit applications by any source that emits, or has a potential
emission rate of, one hundred tons per year or more of any regulated air contaminant,
including any source of fugitive emissions of each regulated air contaminant, at least
sixty days prior to the date on which construction or major modification is to commence;
(6)
a schedule of construction permit fees sufficient to cover the reasonable
costs of:
(a) reviewing and acting upon any application for such permit; and
(b) implementing and enforcing the terms and conditions of the permit,
excluding any court costs or other costs associated with an enforcement action;
(7)
a schedule of emission fees consistent with the provisions of Section
502(b)(3) of the 1990 amendments to the federal act;
(8)
a method for accelerated permit processing that may be requested at the
sole discretion of the applicant at the time the applicant submits a construction permit
application and that:
(a) allows the department or local agency to contract with qualified outside
firms to assist the department or local agency in its accelerated review of the
construction permit application; provided that the department or local agency can
contract with a qualified firm that does not have a conflict of interest; and
(b) establishes a process for the department or local agency to account for
the expenditure of the accelerated permit processing fees;
(9)
allowance for additional permit application fees, sufficient to cover the
reasonable costs of an accelerated permit application review process. Before the
applicant is notified that the permit application has been determined to be complete, the
department or local agency shall give the applicant a reasonable estimate of costs of an
accelerated permit application review process;
(10)
specification of the maximum length of time for which a permit shall be
valid; provided that for an operating permit such period may not exceed five years; and
(11)
for an operating permit only:
(a) provisions consistent with Sections 502(b) and 505(b) of the federal act
providing: 1) notice to and review and comment by the United States environmental
protection agency; and 2) that if the department or local agency receives notice of
objection from the United States environmental protection agency before the operating
permit is issued, the department or the local agency shall not issue the permit unless it
is revised and issued under Section 505(c) of the federal act;
(b) provisions governing renewal of the operating permit; and
(c) specification of the conditions under which the operating permit may be
terminated, modified or revoked and reissued prior to the expiration of the term of the
operating permit.
C. Except as provided in Subsection O of this section, the department or the local
agency may deny any application for:
(1)
a construction permit if it appears that the construction or modification:
(a) will not meet applicable standards, rules or requirements of the Air Quality
Control Act or the federal act;
(b) will cause or contribute to air contaminant levels in excess of a national or
state standard or, within the boundaries of a local authority, applicable local ambient air
quality standards; or
(c) will violate any other provision of the Air Quality Control Act or the federal
act; and
(2)
an operating permit if the source will not meet the applicable standards,
rules or requirements pursuant to the Air Quality Control Act or the federal act.
D. The department or the local agency may specify conditions to any permit granted
under this section, including:
(1)
for a construction permit:
(a) a requirement that such source install and operate control technology,
determined on a case-by-case basis, sufficient to meet the standards, rules and
requirements of the Air Quality Control Act and the federal act;
(b) individual emission limits, determined on a case-by-case basis, but only as
restrictive as necessary to meet the requirements of the Air Quality Control Act and the
federal act or the emission rate specified in the permit application, whichever is more
stringent;
(c) compliance with applicable federal standards of performance;
(d) reasonable restrictions and limitations not relating to emission limits or
emission rates; or
(e) any combination of the conditions listed in this paragraph; and
(2)
for an operating permit, terms and conditions sufficient to ensure
compliance with the applicable standards, rules and requirements pursuant to the Air
Quality Control Act and the federal act.
E. This section does not authorize the department or the local agency to require the
use of machinery, devices or equipment from a particular manufacturer if the federal
standards of performance, state regulations and permit conditions may be met by
machinery, devices or equipment otherwise available.
F. The issuance of a permit does not relieve any person from the responsibility of
complying with the provisions of the Air Quality Control Act and any applicable
regulations of the environmental improvement board or the local board. Any conditions
placed upon a permit by the department or the local agency shall be enforceable to the
same extent as a regulation of its board.
G. A person who participated in a permitting action before the department or the
local agency shall be notified by the department or the local agency of the action taken
and the reasons for the action. Notification of the applicant shall be by certified mail.
H. A person who participated in a permitting action before the department or the
local agency and who is adversely affected by such permitting action may file a petition
for hearing before the environmental improvement board or the local board. The
petition shall be made in writing to the environmental improvement board or the local
board within thirty days from the date notice is given of the department's or the local
agency's action. Unless a timely petition for hearing is made, the decision of the
department or the local agency shall be final.
I. If a timely petition for hearing is made, the environmental improvement board or
the local board shall hold a hearing within sixty days after receipt of the petition. The
environmental improvement board or the local board shall notify the petitioner and the
applicant or permittee, if other than the petitioner, by certified mail of the date, time and
place of the hearing. If the subject of the petition is a permitting action deemed by the
environmental improvement board or the local board to substantially affect the public
interest, the environmental improvement board or the local board shall ensure that the
public receives notice of the date, time and place of the hearing. The public in such
circumstances shall also be given a reasonable opportunity to submit data, views or
arguments orally or in writing and to examine witnesses testifying at the hearing. Any
person submitting data, views or arguments orally or in writing shall be subject to
examination at the hearing.
J. The environmental improvement board or the local board may designate a
hearing officer to take evidence in the hearing. All hearings shall be recorded.
K. The burden of proof shall be upon the petitioner. Based upon the evidence
presented at the hearing, the environmental improvement board or the local board shall
sustain, modify or reverse the action of the department or the local agency respectively.
L. Notwithstanding any other provision of law and subject to the provisions of
Section 74-2-4 NMSA 1978, a final decision on a permit by the department, the
environmental improvement board, the local agency, the local board or the court of
appeals that a source will or will not meet applicable local, state and federal air pollution
standards and regulations shall be conclusive and is binding on every other state
agency and as an issue before any other state agency shall be deemed resolved in
accordance with that final decision.
M. Subject to the provisions of Section 74-2-4 NMSA 1978, if the local board has
adopted a permit regulation pursuant to this section, persons constructing or modifying
any source within the boundaries of the local authority shall obtain a permit from the
local agency and not from the department.
N. Fees collected pursuant to this section shall be deposited in:
(1)
the state air quality permit fund created by Section 74-2-15 NMSA 1978 if
collected by the department; or
(2)
a fund created pursuant to Section 74-2-16 NMSA 1978 if collected by a
local agency pursuant to a permit regulation adopted by the local board pursuant to this
section.
O. The department may not deny an application for a construction permit for a
cotton gin if the applicant proposes use of the best system of emissions reduction
currently in use by cotton gins in the United States, as specified by regulation of the
environmental improvement board, and the cotton gin has a potential emission rate,
considering the use of the proposed emissions reduction system and the proposed
hours of operation, of not more than fifty tons per year of any regulated air contaminant
for which there is a national ambient air quality standard. The construction permit shall
require that the applicant use the proposed emission reduction system and limit the
hours of operation to the hours specified in the application. For purposes of this
subsection, "best system of emissions reduction" for cotton gins means a system that
will result in emissions reduction equal to or greater than that obtained by the use of
condenser screens, seventy-mesh screen or equivalent on low-pressure exhausts and
high-efficiency cyclone dust collectors on high-pressure exhausts.
P. The department or local agency may deny any permit application or revoke any
permit issued pursuant to the Air Quality Control Act if, within ten years immediately
preceding the date of submission of the permit application, the applicant or permittee
has:
(1)
knowingly misrepresented a material fact in an application for a permit;
(2)
refused to disclose the information required by the provisions of the Air
Quality Control Act;
(3)
been convicted in any court of any state or the United States of:
(a) a felony related to environmental crime; or
(b) a crime defined by state or federal statute as involving or being in restraint
of trade, price fixing, bribery or fraud;
(4)
constructed or operated a facility for which a permit is sought without a
permit required by the Air Quality Control Act, except when such an unpermitted facility
is discovered after acquisition in the course of a timely environmental audit authorized
by department or local board policy and except if:
(a) the operator of the facility using good engineering practices and
established approved calculation methodologies estimated that the facility's emissions
would not require a permit pursuant to the Air Quality Control Act; and
(b) upon discovery of the discrepancy between the calculated pre-
construction maximum facility emissions and the calculated post-construction maximum
facility emissions, the operator of the facility applies for the appropriate permit within
thirty calendar days; or
(5)
had any permit revoked or permanently suspended for cause under the
environmental laws of any state or the United States.
Q. In making a finding under Subsection P of this section, the department or local
agency may consider aggravating and mitigating factors.
R. If an applicant or permittee whose permit is being considered for denial or
revocation on any basis provided by Subsection P of this section has submitted an
action plan that has been approved in writing by the secretary or director, and plan
approval includes a period of operation under a conditional permit that will allow the
applicant or permittee a reasonable opportunity to demonstrate its rehabilitation, the
secretary or director may issue a conditional permit for a reasonable period of time.
S. An applicant for a permit pursuant to the Air Quality Control Act shall file a
disclosure statement with the department or local agency with the information listed in
Subsection P of this section, and on a form developed by the department. An existing
permit holder shall provide such disclosure upon request by the department or local
agency.