NAC 704A.530

Additional advances.

Year: 2026Length: 112 wordsOfficial source

Cite as Nev. Admin. Code Sec. 704A.530

1. In addition to the payment required by NAC 704A.520 , the developer shall pay to the telephone company in cash: (a) The estimated cost of conduits and their installation across any existing or planned patio slab, pool decking, paved driveway, decorative planter, extensive landscaping or similar improvement, where the crossing is in accordance with the companyโ€™s design; (b) The estimated cost of conduits and their installation in any location for the benefit of the developer; and (c) The cost of that part of the extension which is more than 100 feet from the subdivision. 2. Advances made pursuant to this section must be accounted for as contributions in aid of construction.
NAC 704A.530: Additional advances. | Justis AI