NAC 349.305

Initial review of application.

Last amended: 1992Year: 2026Length: 75 wordsOfficial source

Cite as Nev. Admin. Code Sec. 349.305

1. Upon the filing of an application, the required fee and, if applicable, a preliminary plan, the Director will review the material to determine if all information required on the application has been provided. 2. Except for an application filed by a municipal obligor, the Director will promptly submit the application and all preliminary plans, permits, specifications and feasibility reports to the State Engineer for initial review and preparation of a report to the Board.
NAC 349.305: Initial review of application. | Justis AI