Ohio Admin. Code 3745-51-756

Rule 3745-51-756. Open-ended valves or lines - equipment leaks

Last amended: 2023Year: 2026Length: 151 wordsOfficial source
119.03 (A) (1) Each open-ended valve or line shall be equipped with a cap, blind flange, plug, or a second valve. (2) The cap, blind flange, plug, or second valve shall seal the open end at all times except during operations requiring hazardous secondary material stream flow through the open-ended valve or line. (B) Each open-ended valve or line equipped with a second valve shall be operated in a manner such that the valve on the hazardous secondary material stream end is closed before the second valve is closed. (C) When a double block and bleed system is being used, the bleed valve or line may remain open during operations that require venting the line between the block valves but shall comply with paragraph (A) of this rule at all other times. Last updated June 12, 2023 at 9:01 AM Supplemental Information Authorized By: 3734.12 Amplifies: 3734.12 Five Year Review Date:
Ohio Admin. Code 3745-51-756: Rule 3745-51-756. Open-ended valves or lines - equipment leaks | Justis AI